Inspections for the day of: Thursday, February 24, 2011.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-02106 BLD-Final2/24/20112/24/20113/3/2011 4:28:58 PMPFAIL
Kevin Phone #: ###-#### c/n items not completed
BLD10-02111 BLD-Final2/24/20112/24/20113/3/2011 4:28:38 PMPFAIL
Kevin Phone #: ###-#### c/n items not completed
BLD10-02109 BLD-Final2/24/20112/24/20113/3/2011 4:28:06 PMPFAIL
Kevin Phone #: ###-#### c/n items not completed
BLD10-02895 BLD-Framing/Rough-in2/23/20112/24/20112/24/2011 2:57:42 PMPPART
Phone #: ###-#### >> Inspection requested via web by Tony Luchini framer on site needs to add strapes for beam to top plate connections install a bearing block on truss t15 and trasfer point loads on each end of t15 per plan or get a fix
ESC10-00683 Site Final2/24/20112/24/20112/24/2011 1:34:39 PMPPASS
ESC10-00683 DOC - Permit Finaled2/24/20112/24/20112/24/2011 1:34:30 PMPPASS
BLD10-01853 BLD-Framing/Rough-in2/23/20112/24/20112/24/2011 1:33:28 PMAPART
exterior framing and sheathing insp South side//Rick Phone #: ###-#### ok to cover south ext
BLD10-02103 BLD-Final2/23/20112/24/20112/24/2011 1:32:15 PMAPART
after 10am//Evelyn or cell # ###-#### Phone #: ###-#### everthing is ok but still needs a plumbing final
BLD10-02558 BLD-Final2/24/20112/24/20112/24/2011 1:26:16 PMPFAIL
braxon Phone #: ###-#### needs to finish roofing house needs address posted and clean up lot
BLD10-02635 BLD-Final2/23/20112/24/20112/24/2011 11:56:31 AMANR
call when on way//Jerry Phone #: ###-####
BLD10-02305 BLD-Final2/24/20112/24/20112/24/2011 11:55:45 AMPPASS
david Phone #: ###-####
BLD10-02305 DOC - Permit Finaled2/24/20112/24/20112/24/2011 11:55:32 AMPPASS
BLD10-02760 BLD-Final2/23/20112/24/20112/24/2011 11:50:31 AMAPASS
call when on way//Jerry Phone #: ###-####
BLD10-02592 BLD-Final2/23/20112/24/20112/24/2011 9:40:20 AMAPASS
john Phone #: ###-####
BLD10-02592 DOC - Permit Finaled2/24/20112/24/20112/24/2011 9:40:08 AMPPASS
GCB11-00004 GCB-Final2/23/20112/24/20112/24/2011 9:02:04 AMAPASS
Footings (Revise Original Inspection Result)Lon or Sergei @ ###-####
GCB11-00004 GCB-Footing2/23/20112/24/20112/24/2011 9:01:33 AMAPASS
Footings (Revise Original Inspection Result)Lon or Sergei @ ###-#### ftg is now about 7ft from prop line and in liner with ext bldg this was oked by sam if they built an one hr fire wall and they did.