FIR11-00550
| INSP-Final Inspection | 2/23/2012 | 2/24/2012 | 2/24/2012 5:29:23 PM | P | PART |
|
|
Completed satisfactory retest of the elevator control functions after repairs made including the lobbies, pit and hoistway devices. Also finished acceptable testing of fire sprinkler monitoring including floor control valves, fire pump, MP station.
|
FIR11-00659
| INSP-Sprinkler Rough-in/Hydro | 2/24/2012 | 2/24/2012 | 2/24/2012 5:24:03 PM | P | DEFR |
|
|
Intended for hydrostatic testing of the new system supply main.
|
FIR12-00097
| INSP-Final Inspection | 2/23/2012 | 2/24/2012 | 2/24/2012 5:20:02 PM | A | FAIL |
|
|
Noted missing appliances at two locations shown on plans as existing within the remodel area, overspacing at the new A/V adjusted while on site.
|
FIR12-00020
| INSP-Sprinkler Rough-in | 2/23/2012 | 2/24/2012 | 2/24/2012 5:15:06 PM | A | PART |
|
|
UG fire supply line IBR only approved for cover at this time.
|
FIR12-00045
| INSP-Sprinkler Rough-in | 2/23/2012 | 2/24/2012 | 2/24/2012 5:14:19 PM | A | FAIL |
|
|
Correction items include painted upright sprinklers at several locations, missing two uprights per plan at the stock room area, pendent heads above the cooler may need to be relocated due to equipment changes.
|