FIR16-00701
| INSP-Sprinkler Rough-in | 2/24/2017 | 2/24/2017 | 2/24/2017 3:02:43 PM | P | PART |
|
|
Partial rough to cover inspection complete for underground supply, notated city approved drawings area's approved for cover.
|
BLD16-03359
| FIRE-Final Inspection | 2/23/2017 | 2/24/2017 | 2/24/2017 2:06:56 PM | A | PART |
|
|
Life fire safety inspection complete for buildings 4, 5 and 6 with exception to rooms 411, 413, 513 and 613 (mentioned rooms are ADA rooms, modifications to the fire alarm system are not complete, after inspection for fire alarms is complete building 4,5 and 6 will be complete)
|
FIR16-00299
| INSP-Sprinkler Rough-in | 2/22/2017 | 2/24/2017 | 2/24/2017 1:17:36 PM | A | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping/pendant heads in hotel rooms on level 3 complete (public common area's will need inspected after pendant heads are installed at a later date). Hotel rooms approved for cover on level 3.
|
FIR16-00511
| INSP-Sprinkler Rough-in/Hydro | 2/23/2017 | 2/24/2017 | 2/24/2017 10:59:12 AM | A | PASS |
|
|
Rough to cover inspection for standpipe complete, approved for cover. Hydrostatic test for standpipe complete.
|
BLD16-01515
| FIRE-Final Inspection | 2/23/2017 | 2/24/2017 | 2/24/2017 9:31:22 AM | A | PASS |
|
|
Previously noted items have been repaired, no fire sprinklers, no fire aarms, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete
|
FIR16-00556
| INSP-Sprinkler Rough-in | 2/23/2017 | 2/24/2017 | 2/24/2017 8:37:42 AM | A | PART |
|
|
Rough to cover inspection for Pod 2 complete, levels 1 and 2 approved for cover, level 3 cannot be completed until tenting inspection is complete.
|