BLD96-00734
| INSP - Carpentry | 2/25/1997 | 2/25/1997 | 2/25/1997 12:00:00 AM | | PART |
|
|
/ / 340 - CHK'D PLBG THRU BCI'S; TOLD TO CHK ENG'S DESIGN & BLOCKS AT
|
BLD96-01205
| INSP - Conference | 2/25/1997 | 2/25/1997 | 2/25/1997 12:00:00 AM | | PASS |
|
|
/ / 340 - DISCUSSED 2HR WALL DETAIL REJECTED W SUPT.
|
BLD96-01792
| INSP - Conference | 2/25/1997 | 2/25/1997 | 2/25/1997 12:00:00 AM | | PASS |
|
|
/ / 340 - W/ MIKE OF REHAB RE C/N PLACED
|
BLD96-00734
| INSP - Framing/Rough-in | 2/24/1997 | 2/25/1997 | 2/25/1997 12:00:00 AM | A | NR |
|
|
02/25/97 340 - NR FOR FRAME INSP
|
BLD96-02491
| INSP - Final | 2/25/1997 | 2/25/1997 | 2/25/1997 12:00:00 AM | P | CANC |
|
|
02/25/97 340 -
|
BLD97-00155
| INSP - Framing/Rough-in | 2/24/1997 | 2/25/1997 | 2/25/1997 12:00:00 AM | P | FAIL |
|
|
C/N TEMP WINDOW AT BAY, FIREBLOCKS, STRAPS. OK TO INS. 02/25/97 340 -
|