Inspections for the day of: Tuesday, February 25, 1997.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD97-00284 INSP - Letter of compliance2/25/19972/25/19972/25/1997 12:00:00 AM PASS
/ / 350 - c/c #11296
BLD97-00284 INSP - Letter of compliance2/25/19972/25/19972/25/1997 12:00:00 AM PASS
/ / 350 - c/c #11296
BLD96-03200 INSP - Foundation2/25/19972/25/19972/25/1997 12:00:00 AM PASS
/ / 350 - stem walls ok, as per plan
MEC97-00480 INSP - Framing/ Rough-in2/24/19972/25/19972/25/1997 12:00:00 AMAPASS
02/25/97 350 - INSTALL CHILLED WATER AND CONDENSOR WITH RELATED PUMPS. AT&T..BASEMENT ok as per plans and specs
BLD97-00369 INSP - Conference2/24/19972/25/19972/25/1997 12:00:00 AMAPASS
02/25/97 350 - went over setbacks for garage on back of property. all s planning and zoning and stamped
BLD97-00284 INSP - Final2/21/19972/25/19972/25/1997 12:00:00 AMAPASS
02/25/97 350 - final
MEC3046907 INSP - Final2/24/19972/25/19972/25/1997 12:00:00 AMAFAIL
02/25/97 350 - no final, corrections and need to finish w/h installation
MEC3046907 INSP - Final2/24/19972/25/19972/25/1997 12:00:00 AMAFAIL
02/25/97 350 - no final, corrections and need to finish w/h installation
MEC96-01923 INSP - Final2/25/19972/25/19972/25/1997 12:00:00 AMPFAIL
02/25/97 350 - no final, many corrections posted
MEC96-01923 INSP - Final2/25/19972/25/19972/25/1997 12:00:00 AMPFAIL
02/25/97 350 - no final, many corrections posted
MEC96-01924 INSP - Final2/25/19972/25/19972/25/1997 12:00:00 AMPFAIL
02/25/97 350 - no final, many corrections posted
MEC96-01924 INSP - Final2/25/19972/25/19972/25/1997 12:00:00 AMPFAIL
02/25/97 350 - no final, many corrections posted
MEC96-03840 INSP - Final2/25/19972/25/19972/25/1997 12:00:00 AMPPASS
02/25/97 350 - final
MEC96-03840 INSP - Final2/25/19972/25/19972/25/1997 12:00:00 AMPPASS
02/25/97 350 - final
MEC96-04004 INSP - Final2/25/19972/25/19972/25/1997 12:00:00 AMPPASS
02/25/97 350 - final
MEC96-04004 INSP - Final2/25/19972/25/19972/25/1997 12:00:00 AMPPASS
02/25/97 350 - final
MEC97-00328 INSP - Partial final2/25/19972/25/19972/25/1997 12:00:00 AMPFAIL
02/25/97 350 - partial final/north bld/ re-inspection on gas test no final, ductwork ok, but gas pipe to two new units on roof is undersiz
BLD97-00352 INSP - Footings2/25/19972/25/19972/25/1997 12:00:00 AMPPASS
02/25/97 350 - TIM IS TRYING TO REACH YOU BUT CIRCUITS ARE LOADED. IF NO AT ###-####. HE HAS CONCRETE WAITING. ftns ok
BLD96-03200 INSP - Footings2/24/19972/25/19972/25/1997 12:00:00 AMPNR
02/25/97 350 - STEM WALL still being formed up, check pm
BLD97-00206 INSP - Energy code compliance2/24/19972/25/19972/25/1997 12:00:00 AMPPASS
02/25/97 350 - insulation ok, ok to cover