MEC99-04298
| Rough-in | 2/24/2000 | 2/25/2000 | 2/25/2000 12:00:00 AM | A | FAIL |
|
|
###-#### Becky
|
MEC99-04299
| Rough-in | 2/24/2000 | 2/25/2000 | 2/25/2000 12:00:00 AM | A | FAIL |
|
|
###-####
|
MEC99-01944
| Final | 2/25/2000 | 2/25/2000 | 2/25/2000 12:00:00 AM | P | PASS |
|
|
###-#### Sign occ. card 2/28/00 2:14:02 PM
|
MEC00-00180
| Final | 2/25/2000 | 2/25/2000 | 2/25/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/25/2000 at 11:03:47. Contact: ###-####. Need gas pressure test. 2/28/00 2:14:13 PM
|
MEC99-04166
| Final | 2/25/2000 | 2/25/2000 | 2/25/2000 12:00:00 AM | P | PASS |
|
|
Sign occ. card
|
MEC00-00064
| Final | 2/25/2000 | 2/25/2000 | 2/25/2000 12:00:00 AM | P | PASS |
|
|
Sign occ. card.
|