FIR99-00693
| INSP-Alarm Testing | 2/24/2000 | 2/25/2000 | 2/25/2000 12:00:00 AM | A | PASS |
|
|
###-#### Ok on fire alarm system test. 2/25/00 3:12:59 PM
|
FIR99-00693
| INSP-Final Inspection | 2/24/2000 | 2/25/2000 | 2/25/2000 12:00:00 AM | A | PASS |
|
|
###-#### or ###-#### Rob Ok on sprkl. 2/25/00 3:12:11 PM OK on sprkl. system for new hangar. 2/25/00 3:12:25 PM
|
BLD99-02756
| FIRE-Final Inspection | 2/24/2000 | 2/25/2000 | 2/25/2000 12:00:00 AM | A | PART |
|
|
###-#### Final ok on alarm & sprklr. system. bldg. final no yet scheduled. 2/25/00 3:12:50 PM
|
FIR99-00417
| INSP-Final Inspection | 2/25/2000 | 2/25/2000 | 2/25/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/25/2000 at 08:24:52. Contact: ###-####. Ok supply line flush of relocated PIV valve ok R/I of relocated FDC & PIV. 2/28/00 2:18:05 PM
|
FIR99-00640
| INSP-Sprinkler Rough-in/Hydro | 2/25/2000 | 2/25/2000 | 2/25/2000 12:00:00 AM | P | PART |
|
|
###-#### Ok hydro test of system #4 drysystem. 2/28/00 2:16:55 PM
|
BLD99-02959
| FIRE-Final Inspection | 2/25/2000 | 2/25/2000 | 2/25/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Final fail c/N issued signage & curb striping. 2/28/00 2:16:32 PM
|
FIR00-00008
| INSP-Sprinkler Rough-in | 2/24/2000 | 2/25/2000 | 2/25/2000 12:00:00 AM | P | NR |
|
|
###-#### 1pm or ###-#### call first to meet there Will be ready on 2/28. 2/28/00 2:19:01 PM
|