PLM00-02022
| Final | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | A | NR |
|
|
John ###-####
|
PLM02-00437
| Plumbing Rough-in | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | A | PASS |
|
|
r/i- ###-#### eddie
|
PLM02-00385
| Plumbing Rough-in | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 06:34:34. Contact: ###-####.
|
PLM02-00314
| Plumbing Rough-in | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PART |
|
|
###-#### rod
|
PLM02-00113
| Final | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PASS |
|
|
fn ###-####- lenny
|
PLM02-00442
| Water and/or Sewer | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PASS |
|
|
###-#### leo
|
PLM02-00443
| Plumbing Rough-in | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PASS |
|
|
office ###-####
|
MIS02-00033
| PLM-Conference | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | FAIL |
|
|
per Lee wrote lenghtly correction notice, 2/25/2002 3:32:48 PM wrote stop work double feeplb ,ele, struct,heating.double fee ,health and safety, do not occupy structure, took many colered pics, gave copies to all supers,and bob a. on 2/15/02 gave five days to fix 2/25/2002 3:38:22 PM
|
MIS02-00033
| PLM-Conference | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 334 On 2/25/2002 3:40:16 PM talked at lenght with jerry hale ,that he needs to get rezoned,and all permits needed to turn this structure into a apartment,and made it clear what he needs to do ,for about thirty minutes 2/25/2002 3:51:07 PM
|
PLM00-02022
| Final | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | FAIL |
|
|
John ###-#### run waterheater relief line outside###-#### 2/25/2002 2:39:22 PM
|