BLD01-00601
| BLD-Wall cover | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/22/2002 at 16:29:19. Contact: ###-####...see frame insp same date. 2/25/2002 2:10:28 PM
|
BLD01-03205
| BLD-Energy code compliance | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 02/22/2002 at 08:14:09. Contact: ###-####...walls ok to cover.
2/25/2002 1:32:01 PM
|
BLD99-03148
| BLD-Final | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by Inspector: 301 On 2/22/2002 4:08:03 PM
|
BLD99-03148
| BLD-Conference | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 301 On 2/22/2002 4:08:36 PM ..P&Z ok w/ postponement of ext work...canopies, etc. Separate permit ?? 2/25/2002 4:11:12 PM
|
BLD01-01993
| BLD-Conference | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PASS |
|
|
rick ###-####; re stairs: remove underlay at top of run, adjust other risers to best result...existing steel framed stair. Stairs at other side will require proper rails per 1003,ubc. 2/25/2002 5:17:03 PM
|
BLD01-02264
| BLD-Final | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | NR |
|
|
dan ###-####
|
BLD99-03148
| BLD-Final | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PASS |
|
|
brett ###-#### ; grease duct system bonded. exterior canopies now on separate permit. 2/25/2002 3:56:46 PM
|
BLD99-03148
| BLD-Final | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by Inspector: 407 On 2/25/2002 10:27:53 AM
|
BLD01-00601
| BLD-Framing/Rough-in | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 2/25/2002 2:09:43 PM ok to insul; need verify int. gypsum shear panels when installed
|
BLD01-00601
| BLD-Energy code compliance | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 2/25/2002 2:10:53 PM walls ok to cover
|
BLD01-03277
| BLD-Conference | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 2/25/2002 2:14:18 PM need detail & inspect shaft 2/25/2002 5:34:14 PM
|
BLD00-02175
| BLD-Final | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PASS |
|
|
Cathy has the card; struct ok for c/o 2/25/2002 4:21:30 PM
|
BLD00-02175
| BLD-Conference | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 2/25/2002 4:19:26 PM w/ 409 re final...fire ok
|