BLD01-02923
| BLD-Final | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | A | PASS |
|
|
fn kirk- ###-####
|
BLD02-00141
| BLD-Footing | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | A | FAIL |
|
|
###-#### PHILLIP ###-#### plan indicates a 3 foot bevel at bottom. 2/25/2002 11:56:26 AM
|
BLD01-02789
| BLD-Final | 2/24/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 02/24/2002 at 18:15:31. Contact: ###-####.needs other trades signed of first. 2/25/2002 11:25:21 AM
|
BLD01-01955
| BLD-Framing/Rough-in | 2/24/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/24/2002 at 20:42:15. Contact: ###-####. Most corrections complete still need a few items on c/n posted. 2/25/2002 4:21:31 PM
|
BLD02-00118
| BLD-Framing/Rough-in | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC02-00445
| Final | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 10:33:55. Contact: 34451992.
|
MEC02-00552
| Final | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD02-00149
| BLD-Framing/Rough-in | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 407 On 2/25/2002 3:40:16 PM need truss details and stud blocking at new beam at existing wall callled contractor. ok to insulate. 2/25/2002 3:42:39 PM
|
BLD01-01685
| BLD-Final | 2/20/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | FAIL |
|
|
###-#### RICK PEPPERKORN OR CELL ###-####. needs smoke detectors. owner said he wanted an inspection on the 26th., 2/25/2002 2:29:57 PM
|
BLD01-01994
| BLD-Concrete | 2/21/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 02/21/2002 at 08:25:47. Contact: ###-####. Subject to S-I. 2/25/2002 4:40:26 PM
|