Inspections for the day of: Monday, February 25, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02264 FIRE-Final Inspection2/22/20022/25/20022/25/2002 12:00:00 AMAPASS
###-####
FIR01-00558 INSP-Final Inspection2/25/20022/25/20022/25/2002 12:00:00 AMAPASS
Added by Inspector: 409 On 2/25/2002 10:50:07 AM
FIR01-00429 INSP-Final Inspection2/25/20022/25/20022/25/2002 12:00:00 AMAFAIL
Scheduled by Inspector: 409 On 2/25/2002 10:55:01 AM need hydro and 911 on bell 2/25/2002 11:00:07 AM
FIR01-00482 INSP-Final Inspection2/25/20022/25/20022/25/2002 12:00:00 AMAFAIL
Scheduled by Inspector: 409 On 2/25/2002 10:55:41 AM need battery calcs for FACP and batteries to match review notes; tamper reports trouble; need address assigned to this system; strobe in rec center activates on this alarm 2/25/2002 11:01:34 AM
BLD01-00644 FIRE-Final Inspection2/20/20022/25/20022/25/2002 12:00:00 AMAFAIL
###-#### 9am need building address; need fire alarma nd sprinkler completed and pass 2/25/2002 11:02:23 AM
FIR01-00432 INSP-Sprinkler Rough-in/Hydro2/21/20022/25/20022/25/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/21/2002 at 14:21:55. Contact: ###-####. overheard r/i okay to cover 2/25/2002 2:20:22 PM
FIR01-00050 INSP-Alarm Testing2/21/20022/25/20022/25/2002 12:00:00 AMPNR
###-#### galem will reshedule 2/25/2002 4:47:54 PM
FIR01-00429 INSP-Sprinkler Rough-in/Hydro2/25/20022/25/20022/25/2002 12:00:00 AMPPASS
Added by Inspector: 409 On 2/25/2002 2:20:00 PM overhead hydro okay