MEC02-00544
| Rough-in | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-00544
| Pressure Test | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | A | PASS |
|
|
|
MEC02-00517
| Final | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | A | PASS |
|
|
fn reinsp ken ###-####
|
MEC02-00541
| Conference | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | A | DONE |
|
|
dave -###-#### for conf location of gas line from meter to house 2/25/2002 10:50:35 AM
|
BLD02-00303
| BLD-Footing | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | A | NR |
|
|
###-####
|
BLD02-00102
| BLD-Framing/Rough-in | 2/22/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | FAIL |
|
|
###-#### larry c/n on site 2/25/2002 4:54:53 PM
|
BLD02-00185
| BLD-Foundation | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
MIS02-00027
| BLD-Final | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PART |
|
|
###-#### ok for temp occ needs to return ends on hand rail 2/25/2002 4:55:46 PM
|
BLD01-00442
| BLD-Final | 2/25/2002 | 2/25/2002 | 2/25/2002 12:00:00 AM | P | PASS |
|
|
###-#### wayne ( call first) c.c # 2/25/2002 2:12:12 PM 22013 issued 2/25/2002 2:12:23 PM
|