MEC04-00512
| Pressure Test | 2/23/2004 | 2/25/2004 | 2/25/2004 12:00:00 AM | A | PASS |
|
|
###-#### daniel
|
MEC04-00512
| Final | 2/23/2004 | 2/25/2004 | 2/25/2004 12:00:00 AM | A | PASS |
|
|
###-#### daniel
|
BLD04-00190
| BLD-Foundation | 2/24/2004 | 2/25/2004 | 2/25/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 2/24/2004 at 6:10:22 AM. Contact: ###-####. wip 2/25/2004 9:35:28 AM
|
MEC04-00517
| Pressure Test | 2/24/2004 | 2/25/2004 | 2/25/2004 12:00:00 AM | A | PART |
|
|
###-#### christina 2/24/2004 3:12:37 PM
gas pressure test to fireplace witnessed by intermountain gas. 2/25/2004 9:59:49 AM
|
BLD03-02212
| BLD-Framing/Rough-in | 2/24/2004 | 2/25/2004 | 2/25/2004 12:00:00 AM | A | PART |
|
|
stair & window final only// chuck or cell # ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Need to anchor south stair at grade to bldg 1024. 2/25/2004 12:05:54 PM
|
BLD03-01626
| BLD-Other | 2/24/2004 | 2/25/2004 | 2/25/2004 12:00:00 AM | A | FAIL |
|
|
tony celing grid; Phone #: ###-#### Internet Inspection Request from: Darla Downs
Need to support t-bar at edges with pop rivet or hangers. Secure lighting at locker area. 2/25/2004 11:17:14 AM
|
BLD03-02330
| BLD-Foundation | 2/25/2004 | 2/25/2004 | 2/25/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/25/2004 at 7:40:30 AM. Contact: ###-####.
|
MIS04-00060
| BLD-Final | 2/23/2004 | 2/25/2004 | 2/25/2004 12:00:00 AM | P | DONE |
|
|
Jim, this is for a rehab inspection landlord's phone # ###-#### these are 2-4-plexes other permit # mis04-00061..
|
MIS04-00061
| BLD-Final | 2/23/2004 | 2/25/2004 | 2/25/2004 12:00:00 AM | P | DONE |
|
|
Jim, this is for a rehab inspection landlord's phone # ###-#### these are 2-4-plexes other permit # mis04-00060..
|