BLD05-00633
| FIRE-Conference | 2/25/2008 | 2/25/2008 | 2/26/2008 4:16:39 PM | P | CANC |
|
|
|
FIR08-00085
| INSP-Sprinkler Rough-in | 2/25/2008 | 2/25/2008 | 2/25/2008 4:48:58 PM | P | PART |
|
|
Rough-in inspection passed. Plans are being resubmitted as per Ben due to sprinkler heads being changed which is effecting the K factor. Piping in the kitchen wall can be covered. A tenting inspection will be required prior to covering with insulation.
|
BLD05-03423
| FIRE-Final Inspection | 2/25/2008 | 2/25/2008 | 2/25/2008 4:24:35 PM | P | FAIL |
|
|
There were no approved plans or notes on site. No inspection performed.
|
FIR08-00070
| INSP-Supply line flush | 2/25/2008 | 2/25/2008 | 2/25/2008 4:23:41 PM | P | PASS |
|
|
The underground flush passed.
|
FIR07-00987
| INSP-Conference | 2/25/2008 | 2/25/2008 | 2/25/2008 4:20:42 PM | P | DONE |
|
|
Conference was for placement of the Knox Box. As it turned out there is an existing knox box mounted on the right hand side of the gate and per personell with Idaho Power the Knox Box contains card passes for both buildings.
|