Inspections for the day of: Monday, February 25, 2008.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-00003 Random Inspection2/25/20082/25/20082/25/2008 3:59:24 PMPPART
Dabout tracking discussed with RP (Brian H.) with the tracking issue. Explained to him he must re-stabilize his entrance and construction area. They have a street sweeper M-F coming 5:15pm every day to clean-up. Will reinspect tomorrow to see clean up. Wil give him until next Monday to re-stabile the entrance and parking area if he can stay on top of clean up.

CAS#460
###-####
ESC07-00924 Random Inspection2/25/20082/25/20082/25/2008 3:22:16 PMPPART
Discussed with RP (John Wynman) to dress up entrance into project. He explain that he will have it done this week and the will also be widening the enrtance also.
CAS # 460
###-####
ESC08-00038 BMP Violation2/22/20082/25/20082/25/2008 10:05:34 AMAPASS
For the most part the area was cleaned up.
Sediment barrier was placed at front of lot. Sign was also posted at front of lot.
Additional cheverons are place in the gutter to catch sediment that can travel down the gutter pan.
CAS#460
###-####