Inspections for the day of: Wednesday, February 25, 2009.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-02153 FIRE-Final Inspection2/24/20092/25/20092/25/2009 5:15:58 PMAFAIL
See the correction notice left at the job site for items needing addressed.. Per a conversation with Scott the remote FDC and PIV arer not required. I measured the distance from the existing fire hydrant to the now wall mounted PIV and FDC and the distance is roughly 250'-0" which is ok with Scott.
BLD08-01759 FIRE-Final Inspection2/24/20092/25/20092/25/2009 5:14:42 PMAFAIL
See the correction notice left at the job site for items needing addressed.. Per a conversation with Scott the remote FDC and PIV arer not required. I measured the distance from the existing fire hydrant to the now wall mounted PIV and FDC and the distance is roughly 250'-0" which is ok with Scott.
BLD07-02372 FIRE-Final Inspection2/24/20092/25/20092/25/2009 5:13:20 PMAFAIL
See the correction notice left at the job site for items needing addressed.. Per a conversation with Scott the remote FDC and PIV arer not required. I measured the distance from the existing fire hydrant to the now wall mounted PIV and FDC and the distance is roughly 250'-0" which is ok with Scott.
FIR08-00018 INSP-Sprinkler Rough-in/Hydro2/23/20092/25/20092/25/2009 5:05:36 PMAPASS
Approved for cover partial lobby. Apparently, the other portion of the lobby was approved in a prior inspection. One hanger clip was missing and was being installed.
FIR09-00128 INSP-Final Inspection2/25/20092/25/20092/25/2009 5:02:59 PMPPASS
permit finaled
FIR08-00735 INSP-Sprinkler Rough-in/Hydro2/25/20092/25/20092/25/2009 4:54:04 PMPPASS
UDG Hydrotest pasted held 220# for 2 hours.
FIR08-00787 INSP-Sprinkler Rough-in/Hydro2/25/20092/25/20092/25/2009 4:52:37 PMPFAIL
One additional head required above the stairway for proper coverage.
1" install on the second floor when the plan indicates 1 1/4"
Main shifted approximately 5' on the second floor. Shifting the mains affected the hydraulic most remote area.
One head was leaking and was being replaced on the second floor.
Resubmittal of plans is required. Tim Frost
FIR08-00766 INSP-Sprinkler Rough-in/Hydro2/24/20092/25/20092/25/2009 3:57:04 PMAPASS
This was a cover inspection at multiple areas of the underground supply piping. See the city approved plans for locations where the piping is ok to cover.
FIR07-01051 INSP-Sprinkler Rough-in2/24/20092/25/20092/25/2009 3:55:14 PMAPASS
Mike and I agreed that tile will need to be removed on the second floor so that a rough-in inspection of the second floor piping can take place.
FIR09-00128 INSP-Final Inspection2/25/20092/25/20092/25/2009 3:53:49 PMPPART
The first and second floor restrooms are ok to occupy.
BLD08-02487 FIRE-Final Inspection2/25/20092/25/20092/25/2009 3:53:07 PMPPART
The first and second floor restrooms are ok to occupy.
BLD08-02394 FIRE-Final Inspection2/24/20092/25/20092/25/2009 12:08:16 PMAPART
A temporary occupancy was given until one of the main entry/exit doors is provided with approved single action hardware and the locking hardware is removed.
BLD08-02169 FIRE-Final Inspection2/24/20092/25/20092/25/2009 11:15:01 AMAPASS
life safety passed. Contractor to remove the exit sign that is located in the shop but directs people to the locked door to the front offices. Sam the plan reviewer was ok with this due to seven other exits.
FIR08-00460 INSP-Final Inspection2/23/20092/25/20092/25/2009 10:51:40 AMACANC
To be rescheduled per earl Phone #: ###-####
FIR08-00382 INSP-Alarm Testing2/25/20092/25/20092/25/2009 10:35:04 AMAPART
Duplicate inspection see todays entry for items addressed
FIR08-00382 INSP-Final Inspection2/24/20092/25/20092/25/2009 10:34:25 AMAPART
The fire alarm systems in the first and second floor dining areas operated correctly. As-built plans will be required at a minimum or possibly resubmittals depending on how many other changes are made to the project. Just in these two areas the a/v's are ceiling mount instead of wall mount, duct smoke detectors have been added, spot type detector has been added for hvac shutdown and the wall layout has changed. Also the spot type detector being used for hvac shut down has been installed out side of its listing as far as max. cfm and the physical positioning within the duct opening.
BLD07-01846 FIRE-Final Inspection2/24/20092/25/20092/25/2009 10:30:21 AMAPART
The first and second floor dining areas are ok to occupy. The second floor nurses station is ok to occupy.
BLD07-00873 FIRE-Final Inspection2/25/20092/25/20092/25/2009 10:29:27 AMAPASS
life safety passed