MEC09-00386
| Pressure Test | 2/25/2009 | 2/25/2009 | 2/26/2009 8:11:27 AM | P | PASS |
|
|
Eddy Phone #: ###-####
|
ESC08-00954
| Random Inspection | 2/25/2009 | 2/25/2009 | 2/25/2009 3:09:38 PM | P | FAIL |
|
|
left message with Tahoe homes for RP to call me back. RP is required to clean up concrete spoils around site and provide proper containment. Need to do site maintenance such as clean up trash and to remove dirt and debris from hard surfaces
|
MEC08-03639
| Final | 2/24/2009 | 2/25/2009 | 2/25/2009 2:25:02 PM | P | PASS |
|
|
Garage code is 1968 Phone #: ###-#### Internet Inspection Request from: bryan taylor
|
MEC08-03655
| Final | 2/25/2009 | 2/25/2009 | 2/25/2009 2:24:47 PM | P | PASS |
|
|
|
MEC09-00086
| Final | 2/24/2009 | 2/25/2009 | 2/25/2009 1:32:10 PM | P | PART |
|
|
Scott McFarland is the field contact. He needs a final inspection on unit 1308. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet 1308 ok to occupy
|
MEC09-00392
| Final | 2/25/2009 | 2/25/2009 | 2/25/2009 1:29:43 PM | P | PASS |
|
|
kenny is contact ###-#### Internet Inspection Request from: Wayne Van Cleave
|
MEC08-01624
| Rough-in | 2/25/2009 | 2/25/2009 | 2/25/2009 1:21:40 PM | A | PASS |
|
|
ok gas lines to meter 60# test
|
MEC08-03687
| Final | 2/24/2009 | 2/25/2009 | 2/25/2009 11:30:44 AM | A | PASS |
|
|
pat Phone #: ###-####
|
MEC08-00431
| Pressure Test | 2/24/2009 | 2/25/2009 | 2/25/2009 11:29:49 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/24/2009 at 2:41:21 PM. Contact: ###-####. gas ok over locker area
|
MEC09-00379
| Rough-in | 2/24/2009 | 2/25/2009 | 2/25/2009 10:02:30 AM | A | PASS |
|
|
unit 1101. Project Manager Jim (c. ###-####) will have location of install manual. Please call with any questions Phone #: ###-#### Internet Inspection Request from: Mike Almanza
|
MEC09-00382
| Rough-in | 2/25/2009 | 2/25/2009 | 2/25/2009 8:53:31 AM | A | PASS |
|
|
BJ ###-#### Internet Inspection Request from: william kerwin
|