Inspections for the day of: Thursday, February 25, 2010.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00709 INSP-Conference2/24/20102/25/20102/26/2010 5:49:58 PMADONE
Site visit scheduled 2/26 @ 9:30AM.
FIR10-00080 INSP-Sprinkler Rough-in2/25/20102/25/20102/26/2010 5:22:26 PMPPART
Overhead work per the scope of the permit is satisfactory, okayed cover at the drop ceilings. Noted the building is not equipped with a fire alarm panel and lacks fire sprinkler system monitoring.
FIR09-00642 INSP-Sprinkler Rough-in/Hydro2/25/20102/25/20102/26/2010 5:18:00 PMPPART
Begin 24 hr air testing of the new dry system piping at the SE cooler area at 50 psig. @ 2:00PM 2/25. Also completed hydrostatic testing of the new antifreeze loop at the north dock.
FIR09-00707 INSP-Sprinkler Rough-in2/25/20102/25/20102/25/2010 4:03:54 PMPPART
Antifreeze system piping at the west canopy as marked on approved plan set with todays date and initialed okay for cover, one minor adjustment made while on sie, also okayed insulation fill at perimeter soffits on the new porte cochere.
FIR09-00536 INSP-Sprinkler Rough-in2/24/20102/25/20102/25/2010 3:42:44 PMAPART
Begin 24 hr. pneumatic testing of the new dry system at 11:00PM @41psig.
BLD09-02227 FIRE-Conference2/24/20102/25/20102/25/2010 3:41:09 PMADONE
On site conferecne regarding fire sprinkler protection at the relocated radio test room and conditions per IFC 2006 903.3.1.1.1.