FIR08-00143
| FIR-Aging Inspection | 2/25/2011 | 2/25/2011 | 3/1/2011 3:45:26 PM | | NR |
|
|
I spoke to Brian with Lightning Electric about the job status
|
FIR10-00274
| INSP-Final Inspection | 2/25/2011 | 2/25/2011 | 2/25/2011 2:53:36 PM | P | FAIL |
|
|
Provide as-builts and map for the facp with the correct device addressing.
|
FIR11-00062
| INSP-Final Inspection | 2/25/2011 | 2/25/2011 | 2/25/2011 2:49:55 PM | P | PASS |
|
|
permit finaled
|
FIR10-00541
| INSP-Final Inspection | 2/24/2011 | 2/25/2011 | 2/25/2011 2:13:58 PM | P | FAIL |
|
|
No testing was actually performed. The pull station is required to be relocated as per the approved plans. Not addressed on the plans was the requriement for audibility in the new open office and in the pharmacy. A visual device is required in the new restroom that is located within the pharmacy. Also in the reception area at the pharmacy has what appears to be an existing strobe mounted in a new wall. This device will have to meet current code for spacing or the code under which is was installed if it had not been modified.
|
BLD11-00276
| FIRE-Final Inspection | 2/23/2011 | 2/25/2011 | 2/25/2011 10:01:59 AM | A | FAIL |
|
|
Repair all exit signs and emergency lights, remove the dead bolt from the east exterior exit door and resubmit plans with a corrected floor layout.
|