BLD10-01700
| BLD-Framing/Rough-in | 2/24/2011 | 2/25/2011 | 2/25/2011 3:35:25 PM | P | FAIL |
|
|
Brett ###-####. Provide tempered glazing at window in masterbath, add straps to portal frame.
|
BLD10-02519
| BLD-Framing/Rough-in | 2/24/2011 | 2/25/2011 | 2/25/2011 3:24:34 PM | P | FAIL |
|
|
Brett ###-####. Complete fire blocking and add additional straps at portal frame.
|
ESC10-00572
| General Inspection | 2/25/2011 | 2/25/2011 | 2/25/2011 3:04:26 PM | P | PASS |
|
|
|
ESC10-00805
| General Inspection | 2/25/2011 | 2/25/2011 | 2/25/2011 3:04:02 PM | P | PASS |
|
|
|
BLD10-00987
| BLD-Framing/Rough-in | 2/24/2011 | 2/25/2011 | 2/25/2011 2:15:05 PM | P | PASS |
|
|
scott Phone #: ###-####. interior steel stud walls and hardlids for locker rooms, restrooms and hardlid for stairway.
|
BLD10-01276
| BLD-Final | 2/24/2011 | 2/25/2011 | 2/25/2011 2:14:07 PM | P | FAIL |
|
|
zack - please call 1/2 hr prior Phone #: ###-####. Noted two exit bdoors with keyed hardware. Needs to only provide one main enterance/exit door with keyed hardware.
|
GCB10-00066
| GCB-Framing | 2/24/2011 | 2/25/2011 | 2/25/2011 12:09:48 PM | A | FAIL |
|
|
FramingDave @ ###-####Call in advance. Needs to complete airseal package prior to framing inspections, Appears that mechanical rough in inspection failed. Called contractor approx. 45 minutes prior to arrival.
|
GCB11-00006
| GCB-Footing | 2/24/2011 | 2/25/2011 | 2/25/2011 11:58:21 AM | A | PASS |
|
|
FootingsBill @ ###-####
|
BLD11-00291
| BLD-Footing | 2/24/2011 | 2/25/2011 | 2/25/2011 11:26:56 AM | A | PASS |
|
|
dennis Phone #: ###-####
|
ESC11-00080
| Site Preparation | 2/25/2011 | 2/25/2011 | 2/25/2011 11:26:40 AM | A | PASS |
|
|
|