PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, February 25, 2011
.
Number of inspections:
13
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC11-00086
Site Preparation
2/21/2011
2/25/2011
2/25/2011 3:55:35 PM
A
CANC
ESC11-00043
Site Preparation
2/25/2011
2/25/2011
2/25/2011 3:55:22 PM
PASS
ESC11-00044
Site Preparation
2/25/2011
2/25/2011
2/25/2011 3:55:15 PM
PASS
ESC10-00612
General Inspection
2/25/2011
2/25/2011
2/25/2011 2:42:23 PM
PASS
ESC09-00791
Site Final
2/11/2011
2/25/2011
2/25/2011 1:42:35 PM
A
DONE
Due to the weather conditions. Will re-inspect next week on 3/4/2011
ESC11-00018
General Inspection
2/25/2011
2/25/2011
2/25/2011 1:02:35 PM
A
CANC
Wrong date
ESC09-00352
General Inspection
2/25/2011
2/25/2011
2/25/2011 10:45:57 AM
PASS
All dewatering within the Wallings Creek is completed for the irragation channel deversion.
ESC11-00069
General Inspection
2/25/2011
2/25/2011
2/25/2011 10:22:44 AM
DONE
Permit finalled.
ESC11-00069
DOC - Permit Finaled
2/25/2011
2/25/2011
2/25/2011 10:22:21 AM
P
PASS
ESC10-00764
General Inspection
2/25/2011
2/25/2011
2/25/2011 10:02:21 AM
PASS
ESC11-00010
General Inspection
2/25/2011
2/25/2011
2/25/2011 10:02:07 AM
NR
ESC10-00283
Site Final
2/24/2011
2/25/2011
2/25/2011 9:32:11 AM
A
PASS
ESC11-00018
Conference
2/25/2011
2/25/2011
2/25/2011 8:36:34 AM
P
DONE
Went over the preliminary concept of a dewatering the elevator shaft within the basement of the building. Contractor will be dewatering for a period of 3-4 days. with minor amount of water, they will be untilizing a dirt bag with a sediment barrier on the grassy area allowing it to infiltrate and filter through the sediment barrier prior to traveling into the parking lot into the storm drain that has protection installed. Will call for a inspection prior to any dewatering operation occuring to confrim that the perventive measure are installed and working correctly. WIll re-inspect on 2/28/2011AM.