ESC13-00125
| Site Preparation | 2/25/2013 | 2/25/2013 | 2/22/2013 12:00:00 AM | | PART |
|
|
Walked site with Chris Hawkins (RP) and Clint Smith. Contractor in progress of installing SW at perimeter. Discussed proper SW installation and discussed option of an earthern berm in lieu of SW. Also discussed the grading at the north side to limit the amount of runoff reaching the pond. ESC plan shall be incorporated into project SWPPP. Notified contractor to amend project SWPPP and NOI to include the additional 5.5 acre disturbance
|
ESC13-00126
| Site Preparation | 2/25/2013 | 2/25/2013 | 2/20/2013 12:00:00 AM | | PART |
|
|
Pre-permitting conference on site (work was already in progress). Need to provide stabilization within 14 days of inactivity and provide final stabilization at project completion. Trackout controls needed if will continue to drive in and out of site. Post ESC sign.
|