FIR13-00582
| INSP-Final Inspection | 2/24/2014 | 2/25/2014 | 2/25/2014 4:38:01 PM | A | PART |
|
|
Light fixtures at the elevator lobby need relocated, need to verifiy upright protection above the room adjacent to the womens restroom.
|
FIR13-00693
| INSP-Sprinkler Rough-in | 2/24/2014 | 2/25/2014 | 2/25/2014 4:19:11 PM | A | PART |
|
|
Okay to cover overhead fire sprinkler work at the grid ceilings.
|
BLD13-03454
| FIRE-Final Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 4:14:49 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR13-00611
| INSP-Sprinkler Rough-in | 2/25/2014 | 2/25/2014 | 2/25/2014 2:53:32 PM | P | FAIL |
|
|
Need revised plans reflecting accurate floorplan, scope of work, head layout. Noted overspaced coverage at one conference room and an open office area. Outside waterflow bell does not appear functional.
|
FIR14-00048
| INSP-Final Inspection | 2/24/2014 | 2/25/2014 | 2/25/2014 1:58:48 PM | A | PASS |
|
|
Corrections completed- fire alarm testing passed. Permit finaled.
|
BLD14-00326
| FIRE-Final Inspection | 2/24/2014 | 2/25/2014 | 2/25/2014 11:49:18 AM | A | PASS |
|
|
Fire life safety inspection completed satisfactory. Noted fire extinguishers are due annual certification this month. Need to post suite identification prior to structural final.
|
BLD13-02584
| FIRE-Final Inspection | 2/24/2014 | 2/25/2014 | 2/25/2014 10:31:36 AM | A | PART |
|
|
Fire life safety okay pending max. occupant sign is posted, manual thumbturn at the main entry/exit is removed, post signage at the main entry "door to remain unlocked....", landing is not yet complete at the back exit. Note* items to be completed prior to structural final.
|