ESC13-00867
| General Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 4:52:38 PM | | CANC |
|
|
Short staffed. Low risk site
|
ESC13-00515
| Aging Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 4:52:01 PM | | PASS |
|
|
Finaled.
|
ESC13-00515
| DOC - Permit Finaled | 2/25/2014 | 2/25/2014 | 2/25/2014 4:51:47 PM | P | PASS |
|
|
Monument sign is installed and surrounding area landscaped/stabilized. ESC conditions satisfied. All permits finaled.
|
ESC13-00355
| Aging Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 4:11:59 PM | | PASS |
|
|
Near completion. BLD permit is open. No ESC violations observed.
|
ESC13-00381
| Aging Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 3:58:44 PM | | PASS |
|
|
Finaled.
|
ESC13-00381
| DOC - Permit Finaled | 2/25/2014 | 2/25/2014 | 2/25/2014 3:58:25 PM | P | PASS |
|
|
Project complete. BLD permits finaled. ESC conditions met.
|
ESC13-00147
| BMP Violation | 2/25/2014 | 2/25/2014 | 2/25/2014 3:54:10 PM | P | PASS |
|
|
Scott Phone #: ###-####
Corrections complete: 1.Road and gutter in front of Prestige Homes' sites have been swept. 2.Permits re-posted with information 3. ESC general permit pulled for stockpiling lot across street (ESC14-00128) 4. Concrete washout was discussed. Was from previous construction.
Approved. Sites are back in compliance.
|
ESC14-00128
| Site Preparation | 2/25/2014 | 2/25/2014 | 2/25/2014 3:53:00 PM | P | PASS |
|
|
Prestige Homes RP Scott applied for stockpile permit in relation to C/N issued on ESC13-00147 . Permit is posted. Approved.
|
ESC12-00403
| Conference | 2/25/2014 | 2/25/2014 | 2/25/2014 3:12:23 PM | P | PASS |
|
|
JUMP dewatering observation @ 2:30 with Noelle Spencer ###-####
Met with Jon Beck and dewatering technicians. Untreated pump flow was observed flowing into bypass area. Water appeared clear and sand was visible in the washout area from initial flows.
We approved connection to the sediment tanks, (40,000 gallon) which are now filling. Discharge at 9th street outfall should begin this eveninng. ACHD stormwater inspector Jason Korn reviewed monitoring requirements. A background observation at 9th street outfall was conducted, no plume visible. So low volume flow.
Dewatering may commence. Scheduled to continue through the summer.
|
ESC13-01124
| Site Preparation | 2/25/2014 | 2/25/2014 | 2/25/2014 12:40:06 PM | P | PASS |
|
|
heather Phone #: ###-####
Site set up per ESC plan except for construction access. This will be installed by excavator upon start of clearing/digging. Approved. Discussed plans with RP Heather.
|
ESC13-00855
| General Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 12:19:43 PM | | PASS |
|
|
Pool still in progress. No corrections at this time.
|
ESC13-01046
| Site Preparation | 2/21/2014 | 2/25/2014 | 2/25/2014 12:12:11 PM | P | PASS |
|
|
clint Phone #: ###-####
Adjacent homesites already under construction. BMPs installed. Permit posted. Approved for excavation.
|
ESC13-00972
| General Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 12:09:49 PM | | PART |
|
|
Streets are clean and stockpiles in low risk area. Need to keep access alleyway clean.
RP stated sweeper will be coming this week. DI protection is satisfactory.
|
ESC13-00879
| General Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 12:00:34 PM | | PASS |
|
|
Rear silt fence has been re-enforced with wire fencing. Vegetative buffer to canal is maintained. Road work on Boise Ave ongoing, no additional track out from this site. Approved.
|
ESC13-00147
| Site Preparation | 2/24/2014 | 2/25/2014 | 2/25/2014 11:35:39 AM | P | CANC |
|
|
Last correction notice to Scott Zigler to address mulitple BMP violations, and get a permit for the adjacent lot stockpiling. If he has not address issues and gained a general permit for the stockpiling. A Stop Work Order WILL Be Issued. 2nd VM describing violations to him. No word back
(duplicate inspection. BMP violation inspection called in by RP)
|
ESC13-00979
| General Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 11:34:22 AM | | PASS |
|
|
No changes since prior inspection. No activity. No corrections required.
|
ESC14-00083
| Random Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 11:19:20 AM | P | FAIL |
|
|
Correction notice posted.
1. Sweep/clean up concrete washout dust/debris from adjacent gutter on Deer Ridge. 2. Provide trash enclosure/container. 3. Make concrete contractors use designated washout
RP Adam notified by phone. Stated will make corrections ASAP. Framing team will build trash enclosure.
|
ESC13-00510
| Aging Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 11:02:39 AM | | PASS |
|
|
Finaled.
|
ESC13-00510
| DOC - Permit Finaled | 2/25/2014 | 2/25/2014 | 2/25/2014 11:02:11 AM | P | PASS |
|
|
House complete, landscaped, and occupied. ESC permit conditions satisfied.
|
ESC14-00084
| Site Preparation | 2/24/2014 | 2/25/2014 | 2/25/2014 10:56:25 AM | A | PASS |
|
|
rich Phone #: ###-####
Construction access for 3 adjacent lots on Black Gold St by Hayden Homes has been provided. Washout is across Snow Bird. Street sweeping by machine on Snow Bird and Black Gold will be managed by Rich. Permit posted. Approved.
|
ESC14-00053
| Site Preparation | 2/24/2014 | 2/25/2014 | 2/25/2014 10:56:01 AM | A | PASS |
|
|
rich Phone #: ###-####
Construction access for 3 adjacent lots on Black Gold St by Hayden Homes has been provided. Washout is across Snow Bird. Street sweeping by machine on Snow Bird and Black Gold will be managed by Rich. Permit posted. Approved.
|
ESC14-00054
| Site Preparation | 2/24/2014 | 2/25/2014 | 2/25/2014 10:55:38 AM | A | PASS |
|
|
rich Phone #: ###-####
Construction access for 3 adjacent lots on Black Gold St by Hayden Homes has been provided. Washout is across Snow Bird. Street sweeping by machine on Snow Bird and Black Gold will be managed by Rich. Permit posted. Approved.
|
ESC13-00550
| Aging Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 10:13:18 AM | | PASS |
|
|
Finaled.
|
ESC13-00550
| DOC - Permit Finaled | 2/25/2014 | 2/25/2014 | 2/25/2014 10:12:55 AM | P | PASS |
|
|
House is complete. Landscaped and stabilized. ESC permit conditions satisfied.
|
ESC13-00873
| General Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 10:06:54 AM | | PASS |
|
|
Permit posted. Exterior work mostly finished. Fiber wattles contain loose dirt. No corrections required.
|
ESC13-00870
| General Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 9:31:31 AM | | PASS |
|
|
|
ESC12-01066
| Tracking Control | 2/24/2014 | 2/25/2014 | 2/25/2014 9:24:11 AM | A | PASS |
|
|
tracking/DI protection follow up
Loose sand was swept out of gutter adjacent to construction entrance. A DI bag will be put in MS4 north of the NE construction entrance. Spoke with RP Ken regarding Ken corrections which he addressed ASAP. Approved.
|
ESC13-00978
| General Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 8:49:15 AM | | PASS |
|
|
|
ESC12-00845
| General Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 8:38:52 AM | | PASS |
|
|
Retaining wall being put in on west parcel. The east is landscaped. WIP. No corrections at this time.
|