GCB14-00099
| GCB-Courtesy | 2/24/2015 | 2/25/2015 | 2/25/2015 4:18:38 PM | P | DONE |
|
|
Larry ###-#### - requested 2p.m. Would like to discuss mechanical as well Pre-Construction Conference Met with Dixie Fellows and Mech. contractor. Met with Structural inspectors....Dave Hannah, Phil Shearer, Tony Young. Brought Sam Zahorka plan check for ride along. Architects were also present.
|
BLD15-00234
| BLD-Foundation | 2/24/2015 | 2/25/2015 | 2/25/2015 4:03:42 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD15-00438
| BLD-Final | 2/24/2015 | 2/25/2015 | 2/25/2015 4:03:19 PM | P | NR |
|
|
Rob ###-#### Waiting for fire final.
|
BLD13-01682
| BLD-Final | 2/24/2015 | 2/25/2015 | 2/25/2015 3:59:36 PM | P | DONE |
|
|
EXP.
|
BLD14-01407
| BLD-Wall Bracing | 2/25/2015 | 2/25/2015 | 2/25/2015 3:59:36 PM | P | PART |
|
|
interior party wall shear Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
BLD15-00446
| BLD-Final | 2/24/2015 | 2/25/2015 | 2/25/2015 3:59:31 PM | A | PASS |
|
|
Shawn Phone #: ###-####
|
BLD15-00446
| DOC - Permit Finaled | 2/25/2015 | 2/25/2015 | 2/25/2015 3:59:30 PM | P | PASS |
|
|
|
BLD13-01682
| DOC - Permit Expired | 2/25/2015 | 2/25/2015 | 2/25/2015 3:58:41 PM | P | PASS |
|
|
|
BLD14-01406
| BLD-Wall Bracing | 2/25/2015 | 2/25/2015 | 2/25/2015 10:55:55 AM | P | CANC |
|
|
Tyler Phone #: ###-#### Inspection cancelled from web by: Tyler Hildebrand
|
BLD14-01412
| BLD-Wall Bracing | 2/25/2015 | 2/25/2015 | 2/25/2015 10:55:49 AM | P | CANC |
|
|
shear inter.// tyler Phone #: ###-#### Inspection cancelled from web by: Tyler Hildebrand
|
BLD15-00380
| BLD-Final | 2/23/2015 | 2/25/2015 | 2/25/2015 10:54:28 AM | A | CANC |
|
|
Yvonne Candejas ###-#### 8- 10:00 Call 1st
|
BLD15-00380
| BLD-Final | 2/23/2015 | 2/25/2015 | 2/25/2015 10:53:58 AM | A | FAIL |
|
|
Yvonne// please call before- homeowner wants to meet you there Phone #: ###-#### C/N Contractor to provide installation instructions for continuous ridge vent product then call for final inspection.
|