BLD06-02323
| BLD-Aging Inspection | 2/25/2015 | 2/25/2015 | 2/27/2015 1:33:24 PM | | PEND |
|
|
|
BLD15-00409
| BLD-Other | 2/25/2015 | 2/25/2015 | 2/26/2015 6:55:05 AM | P | PASS |
|
|
Cliff-soffit Phone #: ###-#### sheet rock on soffit ok to cover
|
BLD14-01937
| BLD-Framing/Rough-in | 2/25/2015 | 2/25/2015 | 2/26/2015 6:54:13 AM | A | PART |
|
|
Lvl 2 framing lvl 3 outer walls. Phone #: ###-#### Inspection requested via web by Julian Lopez rooms 221 theu 228 ok to cover.
|
BLD13-03405
| BLD-Energy code compliance | 2/25/2015 | 2/25/2015 | 2/26/2015 6:52:28 AM | A | PART |
|
|
2,3,4, ; 5th floor Trash chutes in tower 2, 2 hr wall at stair # 1 Inspection requested via web by Tim Toups needs to rock room side in floor space of trash chutes . back of stair tower wall ok.
|
BLD14-03666
| BLD-Footing | 2/25/2015 | 2/25/2015 | 2/26/2015 6:48:57 AM | P | PASS |
|
|
Craig// please call for access Phone #: ###-#### this was for the hold downs and blocking under the new office moble office bldg
|
BLD14-01989
| BLD-Framing/Rough-in | 2/24/2015 | 2/25/2015 | 2/25/2015 3:18:42 PM | P | PASS |
|
|
Inspection of framing prior to insulation and sheetrock. Phone #: ###-#### Inspection requested via web by Ryan Allen
|
GCB14-00054
| GCB-Final | 2/23/2015 | 2/25/2015 | 2/25/2015 2:57:27 PM | P | PASS |
|
|
LaRoy ###-#### - requested call ahead
|
GCB14-00101
| GCB-Energy | 2/25/2015 | 2/25/2015 | 2/25/2015 2:56:45 PM | P | PASS |
|
|
Ty ###-#### air seal ok
|
BLD14-03471
| BLD-Conference | 2/24/2015 | 2/25/2015 | 2/25/2015 11:21:37 AM | A | PASS |
|
|
JP Phone #: ###-####
|