Inspections for the day of: Wednesday, February 25, 2015.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00668 Aging Inspection2/25/20152/25/20152/26/2015 4:05:22 PM PASS
Permit posted. WIP on addition in backyard. Front area needs to be stabilzed/landscaped. No corrections necessary.
ESC14-00169 Aging Inspection2/25/20152/25/20152/25/2015 4:18:05 PM CANC
rescheduled.
ESC14-00824 General Inspection2/25/20152/25/20152/25/2015 4:17:34 PM PASS
WIP. BMPs installed, swales surrounding site are protected with sediment control watttles that are properly installed. No significant trackout or illicit discharges, or sediment runoff issues observed. Permit clearly posted.

No corrective actions needed at this time.
ESC13-01006 General Inspection2/25/20152/25/20152/25/2015 12:56:18 PM PART
WIP on townhome.

Correction request to RP Clint to have street swept at end of the week and to repair sections of damaged silt fence protecting grassy swale. Some sections may be removed since about 70 % of townhomes are complete.
ESC14-00608 General Inspection2/25/20152/25/20152/25/2015 12:46:10 PM PASS
WIP. Landscaping crews and power utilities crews working. No trackout to Warm Springs, no runoff or erosion issues occuring.

Some sandy trackout to Old Hickory should be swept this week or next. Lots of activity in area. Drainage pathway to Warm Springs Creek has been blocked to have onsite retention/infiltration.
ESC15-00035 Site Preparation2/23/20152/25/20152/25/2015 12:43:16 PMPPASS
check for BMP installation

Wattles have been trenched in for sediment control at the stormwater ponds for DH Estates. Drop inlet bags have been installed along north side of Warm Springs at the Dallas Harris cross streets.

Silt fence on south side of Warm Springs is also being installed.

Initial prep activities are now ongoing. Approved to continue
ESC14-00818 General Inspection2/25/20152/25/20152/25/2015 12:24:33 PM PASS
Site pad is prepped for further construction, but no currently activity/vertical construction. Utilities have been installed and lot graded flat. Perimeter wattles are treanched in and MS4 inlets are protected.

No corrections.
ESC13-01267 General Inspection2/25/20152/25/20152/25/2015 12:15:46 PM PASS
Fabric strorage dome is already complete. To be inspected by BLD for structural permits.

No disturbed area onsite or ESC issues. Site surround by paved surface in industrial. ESC permit finaled.
ESC13-01267 DOC - Permit Finaled2/25/20152/25/20152/25/2015 12:15:39 PMPPASS
ESC14-00432 General Inspection2/20/20152/25/20152/25/2015 11:39:16 AMPPASS
Aralar park subdivsion road base and curbs are being installed. 5 mile creek silt fence sediment control and vegetative barrier along bank are working effectively and do not currently need maintenance.

Some minor trackout on Lazaro due to road installation should be swept at the end of each day until paved. Drop inlet has filter bag. No trackout to Overland.

No corrections at this time.
ESC14-00808 General Inspection2/25/20152/25/20152/25/2015 11:18:08 AM PASS
Carport complete. ESC permit conditions satisfied.
ESC14-00808 DOC - Permit Finaled2/25/20152/25/20152/25/2015 11:16:03 AMPPASS
ESC13-01323 Random Inspection2/25/20152/25/20152/25/2015 10:00:26 AMPPASS
Cantabria 4 plex subdivision is in progress. No trackout to Overland or Cloverdale, irrigation canal is protected with silt fence BMP, and drop inlets have protection.

There is a lined concrete washout adjacent to the outbound construction entrance onto Overland.

No dust or other issues, no corrections at this time.
ESC13-01159 General Inspection2/20/20152/25/20152/25/2015 9:35:08 AMPPASS
Work is occuring on individual SFH by CBH. No subdivision development activity. No trackout, dust, or sediment runoff issues.

CBH RP stated that new concrete washout will be built this week.
ESC15-00046 Site Preparation2/24/20152/25/20152/25/2015 9:30:42 AMAPASS
Brett Phone #: ###-####

Permit posted. 10-mile creek is to the north of parcel but walking path, vegetation, and silt fence provide good sediment buffer. Storm drains have inlet protection. Active projects in Peppermill are in compliance.
ESC15-00089 Site Preparation2/24/20152/25/20152/25/2015 9:22:12 AMAPART
Dan Phone #: ###-####

Permit posted and lined concrete washout is provided in development.

Correction needed:

Install storm drain drop inlet protection (filter bag or fiber mat) on all inlets in Southern Landing subdivision.