ELE15-00253
| Final | 2/24/2016 | 2/25/2016 | 2/25/2016 2:51:57 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt manufacturers sticker on door says 70 amp max breaker in all but bottom position in panel which is ok up to 100 amp. Relocate 80 amp breaker
|
ELE15-03682
| Electrical Rough-In | 2/24/2016 | 2/25/2016 | 2/25/2016 2:21:12 PM | A | PASS |
|
|
would like call ahead; Warren Phone #: ###-#### 1st floor only r/i ok
|
ELE12-02998
| ELE-Aging Inspection | 2/25/2016 | 2/25/2016 | 2/25/2016 1:52:57 PM | | DONE |
|
|
too busy
|
ELE15-03849
| Rough-In Permanent Service | 2/25/2016 | 2/25/2016 | 2/25/2016 1:37:32 PM | P | PASS |
|
|
Underground to tanks and service have the Arc fault labels installed Phone #: ###-#### Inspection requested via web by Stan Woodward r/i u.ground raceways from new bldg. out to fuel storage tanks and from existing pumps out to vault and from vault back to new bldg. ok 2" from new bldg. out to vaccums also ok to cover. p/s u/g n ok
|
ELE16-00551
| Final | 2/24/2016 | 2/25/2016 | 2/25/2016 1:05:24 PM | P | PASS |
|
|
please contact Bill Peace at ###-####. thank you Phone #: ###-#### Inspection requested via web by Debby Pierce Bill will label meter base with residence address final ok
|
ELE16-00551
| Permanent Service | 2/25/2016 | 2/25/2016 | 2/25/2016 1:03:45 PM | P | PASS |
|
|
please contact Bill Peace at ###-####. thank you Phone #: ###-#### Inspection requested via web by Debby Pierce installed new meter base and u. ground raceways from new pole feeding 4704 residence. p/s u/g rec ok meter needs to be set when ready NOTE:crew already on site
|
ELE15-04108
| Final | 2/25/2016 | 2/25/2016 | 2/25/2016 12:39:14 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kendall bender final ok checked booth and listings OK
|
ELE16-00509
| Electrical Rough-In | 2/24/2016 | 2/25/2016 | 2/25/2016 11:17:48 AM | A | PASS |
|
|
Reading rooms on the 2nd floor Phone #: ###-#### Inspection requested via web by Kristopher Wilson r/i walls ok
|
ELE15-00495
| Electrical Rough-In | 2/25/2016 | 2/25/2016 | 2/25/2016 10:53:14 AM | P | PASS |
|
|
Cover inspection for the South Stairwell Clearwater building. Phone #: ###-#### Inspection requested via web by Toby Groves r/i ok south stairwell 1 thru 8 only
|
ELE15-03901
| Electrical Rough-In | 2/25/2016 | 2/25/2016 | 2/25/2016 10:51:04 AM | A | PASS |
|
|
R/I inspection for interior walls on east end of 6th floor. Phone #: ###-#### Inspection requested via web by Rafael Castillo partial wall r/i ok see Joey"s E1-6 sheets for pink areas only
|
ELE16-00303
| Electrical Rough-In | 2/25/2016 | 2/25/2016 | 2/25/2016 10:43:55 AM | A | PASS |
|
|
Cover inspection 2nd and 3rd floors East side of building. Phone #: ###-#### Inspection requested via web by Toby Groves partial walls ok see Eric"s E1.2.1 and E.1.3.1 sheets for pink areas only.
|
ELE16-00220
| Electrical Rough-In | 2/24/2016 | 2/25/2016 | 2/25/2016 9:03:56 AM | A | PASS |
|
|
Above ceiling inspect Phone #: ###-#### Inspection requested via web by Greg Idsinga r/i t grid ceilings ok
|
ELE16-00558
| Electrical Rough-In | 2/24/2016 | 2/25/2016 | 2/25/2016 8:20:08 AM | A | PASS |
|
|
Call there is a lock box at the front entry I will give you the code. Phone #: ###-#### Inspection requested via web by robert feller r/i small room walls and ceiling ok
|