BLD15-04138
| FIRE-Conference | 2/25/2016 | 2/25/2016 | 2/26/2016 2:12:39 PM | P | DONE |
|
|
Went over life safety requirements. Need thumbturn off of front door and add emergency lighting in the front office.
|
FIR15-00715
| INSP-Sprinkler Rough-in/Hydro | 2/24/2016 | 2/25/2016 | 2/25/2016 1:57:08 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR15-00716
| INSP-Sprinkler Rough-in/Hydro | 2/24/2016 | 2/25/2016 | 2/25/2016 1:56:17 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR15-00717
| INSP-Sprinkler Rough-in/Hydro | 2/24/2016 | 2/25/2016 | 2/25/2016 1:55:58 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR15-00807
| INSP-Final Inspection | 2/24/2016 | 2/25/2016 | 2/25/2016 1:54:28 PM | P | FAIL |
|
|
See the city approved plans for locations of corrections needed on the horn strobe circuits This includes an add and candella changes. The beam detector at the south end of building has been deleted so spot type detectors will need to be placed. Horns did not sync.The smoke detector in the riser room is mislabeled as water flow. The manual pull stations tested ok. None of the devices in the north half of the building have been installed yet.
|
BLD16-00317
| FIRE-Final Inspection | 2/24/2016 | 2/25/2016 | 2/25/2016 1:42:56 PM | P | FAIL |
|
|
Lower and tag the fire extinguisher, remove the deadbolt from the rear exit, provide covers for the electrical outlets
|
FIR15-00715
| INSP-Supply line flush | 2/24/2016 | 2/25/2016 | 2/25/2016 11:37:06 AM | A | PASS |
|
|
Supply line flush passed
|
FIR15-00716
| INSP-Supply line flush | 2/24/2016 | 2/25/2016 | 2/25/2016 11:36:16 AM | A | PASS |
|
|
Supply line flush passed
|
FIR15-00717
| INSP-Supply line flush | 2/24/2016 | 2/25/2016 | 2/25/2016 11:35:24 AM | A | PASS |
|
|
Supply line flush passed
|
FIR13-00223
| INSP-Final Inspection | 2/24/2016 | 2/25/2016 | 2/25/2016 10:17:43 AM | P | PASS |
|
|
Permit finaled
|