Inspections for the day of: Wednesday, February 26, 1997.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC97-00328 INSP - Conference2/26/19972/26/19972/26/1997 12:00:00 AM PASS
/ / 350 - talked to contractor (robin) about gas piping and temp. fina
BLD96-01571 INSP - Conference2/26/19972/26/19972/26/1997 12:00:00 AM PASS
/ / 350 - looked up information on this job to see why it hadn't been
BLD96-02106 INSP - Conference2/26/19972/26/19972/26/1997 12:00:00 AM PASS
/ / 350 - looked up information for this job, so could final
BLD96-02857 INSP - Final2/26/19972/26/19972/26/1997 12:00:00 AM FAIL
/ / 350 - no final, still need electrical final
BLD97-00233 INSP - Energy code compliance2/26/19972/26/19972/26/1997 12:00:00 AM PASS
/ / 350 - insulation ok, ok to cover
BLD97-00266 INSP - Footings2/25/19972/26/19972/26/1997 12:00:00 AMAPASS
02/26/97 350 - ftns ok, setbacks ok, 5' each side
BLD96-02857 INSP - Final2/25/19972/26/19972/26/1997 12:00:00 AMANR
02/26/97 350 - not ready
MEC97-00355 INSP - Framing/ Rough-in2/25/19972/26/19972/26/1997 12:00:00 AMAPASS
02/26/97 350 - r/i ok
MEC97-00488 INSP - Retro Fit (check note)2/26/19972/26/19972/26/1997 12:00:00 AMPPASS
02/26/97 350 - FURN..THEY ARE THERE AND READY AT 3:00 furn. ok, final
MEC97-00498 INSP - Rough-in & Gas Pressure2/26/19972/26/19972/26/1997 12:00:00 AMPPASS
02/26/97 350 - r/i ok, pt ok
MEC96-01923 INSP - Final2/26/19972/26/19972/26/1997 12:00:00 AMPPASS
02/26/97 350 - final
MEC96-01923 INSP - Final2/26/19972/26/19972/26/1997 12:00:00 AMPPASS
02/26/97 350 - final
MEC96-01924 INSP - Final2/26/19972/26/19972/26/1997 12:00:00 AMPPASS
02/26/97 350 - final
MEC96-01924 INSP - Final2/26/19972/26/19972/26/1997 12:00:00 AMPPASS
02/26/97 350 - final
BLD96-03369 INSP - Framing/Rough-in2/26/19972/26/19972/26/1997 12:00:00 AMPPART
02/26/97 350 - frame ok, stem walls built as per plans with treated wood electrical inspections
BLD97-00233 INSP - Framing/Rough-in2/24/19972/26/19972/26/1997 12:00:00 AMPPASS
02/26/97 350 - frame ok, ok to insulate
BLD97-00239 INSP - Footings2/26/19972/26/19972/26/1997 12:00:00 AMPPASS
02/26/97 350 - ftns poured, setbacks ok