Inspections for the day of: Thursday, February 26, 1998.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC98-00521 INSP - Final2/26/19982/26/19982/26/1998 12:00:00 AM CANC
MEC98-00521 INSP - Final2/26/19982/26/19982/26/1998 12:00:00 AM CANC
BLD97-02476 INSP - Framing/Rough-in2/25/19982/26/19982/26/1998 12:00:00 AMACANC
02/26/98 407 - trans to 301 nspection
MEC97-03482 INSP - Final2/25/19982/26/19982/26/1998 12:00:00 AMACANC
02/26/98 407 - transfer to allen.
MEC97-03482 INSP - Final2/25/19982/26/19982/26/1998 12:00:00 AMACANC
02/26/98 407 - transfer to allen.
BLD97-03614 INSP - Framing/Rough-in2/26/19982/26/19982/26/1998 12:00:00 AMANR
engineering not done and truss calcs not on site.
BLD98-00214 INSP - Foundation2/25/19982/26/19982/26/1998 12:00:00 AMANR
this plan has changed and needs to be re approved by the engineer before i will inspect. They have added a basement to an engineered plan.
BLD98-00135 INSP - Final2/26/19982/26/19982/26/1998 12:00:00 AMPPART
A beam has been added over an existing arched opening and a pocket door has been added,this has been covered with out an inspection,appears to have been the only structural work done. contractor will meet me on site to explain the work.
MEC97-03620 INSP - Final2/26/19982/26/19982/26/1998 12:00:00 AMPCANC
02/26/98 407 - called contractor in reguards to a correction will recall
MEC97-03620 INSP - Final2/26/19982/26/19982/26/1998 12:00:00 AMPCANC
02/26/98 407 - called contractor in reguards to a correction will recall
MEC98-00411 INSP - Final2/26/19982/26/19982/26/1998 12:00:00 AMPPASS
gas test by gas co.
MEC98-00411 INSP - Final2/26/19982/26/19982/26/1998 12:00:00 AMPPASS
gas test by gas co.
MEC98-00479 INSP - Final2/26/19982/26/19982/26/1998 12:00:00 AMPFAIL
waiting for marco to approve liner also need additional clearance.i have called and talked with besco.
MEC98-00479 INSP - Final2/26/19982/26/19982/26/1998 12:00:00 AMPFAIL
waiting for marco to approve liner also need additional clearance.i have called and talked with besco.
MEC98-00490 INSP - Final2/26/19982/26/19982/26/1998 12:00:00 AMPFAIL
left correction about b vent clearance.aiting
MEC98-00490 INSP - Final2/26/19982/26/19982/26/1998 12:00:00 AMPFAIL
left correction about b vent clearance.aiting
BLD97-02983 INSP - Final2/26/19982/26/19982/26/1998 12:00:00 AMPCANC
02/26/98 407 - called jay about a mechanical inspection,he will recall f
BLD97-03299 INSP - Framing/Rough-in2/26/19982/26/19982/26/1998 12:00:00 AMPNR
02/26/98 407 - not ready for insp.p
MEC97-02723 INSP - Final2/26/19982/26/19982/26/1998 12:00:00 AMPFAIL
02/26/98 407 - note this permit does not include the fire place.
MEC97-02723 INSP - Final2/26/19982/26/19982/26/1998 12:00:00 AMPFAIL
02/26/98 407 - note this permit does not include the fire place.
MEC98-00634 INSP - Framing/ Rough-in2/26/19982/26/19982/26/1998 12:00:00 AMPPASS
###-#### shawna
BLD97-00943 INSP - Final2/25/19982/26/19982/26/1998 12:00:00 AMPNR
need fire approval spoke to contractor will recall.WILL CALL YOU TO SCHEDULE A TIME..