MEC01-00409
| Rough-in | 2/23/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/23/2001 at 16:13:01. Contact: ###-####. smashed supply in attic...insul r/a in attic..called cont 2/26/2001 9:33:09 AM
|
MEC01-00409
| Pressure Test | 2/23/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/23/2001 at 16:13:28. Contact: ###-####.
|
MEC01-00541
| Rough-in | 2/23/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | A | FAIL |
|
|
###-####
|
MEC01-00541
| Pressure Test | 2/23/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | A | PASS |
|
|
|
MEC01-00176
| Final | 2/24/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/24/2001 at 13:51:38. Contact: ###-####.
|
BLD00-02350
| BLD-Final | 2/20/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | A | CANC |
|
|
###-#### steve will do this 2/26/2001 10:05:26 AM
|
MEC01-00540
| Final | 2/22/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 16:50:18. Contact: ###-####. not ready...should be r/i and gas 2/26/2001 10:30:59 AM
|
MEC01-00540
| Rough-in | 2/26/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 411 On 2/26/2001 10:33:17 AM need gas equip list and load..seal firestop at b-vent...kit exhaust to be 3' from open window...strap bath exhaust every 4' vert
|
MEC01-00540
| Pressure Test | 2/26/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 411 On 2/26/2001 10:34:34 AM need equip list and load..3/8 to f/p and 1/2" to range...to small
|
MEC01-00482
| Pressure Test | 2/26/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 10:41:22. Contact: ###-####.
|
MEC01-00482
| Rough-in | 2/26/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 10:41:53. Contact: ###-####. need fresh air to both furn 2/26/2001 2:30:15 PM
|
MEC00-03508
| Final | 2/26/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | P | PASS |
|
|
###-#### Sheila
|
MEC01-00348
| Pressure Test | 2/23/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 415 On 2/23/2001 12:49:16 PM
|
MEC01-00348
| Rough-in | 2/23/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 415 On 2/23/2001 12:49:44 PM
|
MEC01-00487
| Rough-in | 2/26/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 08:03:48. Contact: ###-####.
|
MEC01-00551
| Final | 2/26/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 09:01:17. Contact: ###-####.
|
MEC01-00522
| Final | 2/26/2001 | 2/26/2001 | 2/26/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/26/2001 at 09:01:46. Contact: ###-####.
|