Inspections for the day of: Monday, February 26, 2001.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03576 BLD-Energy code compliance2/23/20012/26/20012/26/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/23/2001 at 10:20:23. Contact: ###-####.
BLD00-03091 BLD-Framing/Rough-in2/23/20012/26/20012/26/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/23/2001 at 11:44:14. Contact: ###-####. SHEAR--OK TO SIDE 2/26/2001 12:01:26 PM
BLD00-03370 BLD-Framing/Rough-in2/24/20012/26/20012/26/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/24/2001 at 14:02:22. Contact: ###-####. SHEAR--OK TO SIDE 2/26/2001 9:11:51 AM
BLD00-03638 BLD-Other2/25/20012/26/20012/26/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/25/2001 at 12:54:03. Contact: ###-####. Re-frame gas fireplace--wip--reviewed detail, appears ok 2/26/2001 9:34:33 AM
BLD01-00364 BLD-Footing2/25/20012/26/20012/26/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/25/2001 at 20:39:26. Contact: ###-####. WIP--soil/setbacks appear ok. 2/26/2001 9:20:24 AM
BLD00-02647 BLD-Framing/Rough-in2/26/20012/26/20012/26/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/26/2001 at 01:04:34. Contact: ###-####. Ok to cover framing pending electrical r.i. in deli area. 2/26/2001 10:02:38 AM
BLD00-02350 BLD-Final2/26/20012/26/20012/26/2001 12:00:00 AMAPART
Scheduled by Inspector: 420 On 2/26/2001 10:03:48 AM Energy report needed, electrical outlets need sealed--gaskets or caulk. 2/26/2001 11:39:29 AM
BLD01-00003 BLD-Framing/Rough-in2/26/20012/26/20012/26/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/26/2001 at 10:47:11. Contact: ###-####. SHEAR--OK TO SIDE 2/26/2001 3:53:22 PM
BLD01-00338 BLD-Footing2/26/20012/26/20012/26/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 02/26/2001 at 10:58:23. Contact: ###-####.Excavation only being done, wip. 2/26/2001 2:41:49 PM
MEC00-04464 Final2/26/20012/26/20012/26/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 02/26/2001 at 08:11:50. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/26/2001 at 09:38:19.
BLD00-00092 BLD-Framing/Rough-in2/26/20012/26/20012/26/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 02/26/2001 at 08:17:53. Contact: ###-####. This address and building permit already has been finaled and c. of o. issued. 2/26/2001 2:38:18 PM
BLD00-02446 BLD-Framing/Rough-in2/26/20012/26/20012/26/2001 12:00:00 AMPFAIL
###-####: C/N issued Hd at back of building requires eng. or manu. retrofit, additional nailing required above hd and at misc. locations. 2/26/2001 2:03:08 PM
BLD01-00200 BLD-Framing/Rough-in2/26/20012/26/20012/26/2001 12:00:00 AMPPASS
###-#### ok to cver. 2/26/2001 2:17:27 PM
BLD01-00364 BLD-Foundation2/25/20012/26/20012/26/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/25/2001 at 20:40:18. Contact: ###-####. WIP--hd not installed at time of inspection. 2/26/2001 4:02:13 PM