Inspections for the day of: Tuesday, February 26, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-00445 Plumbing Rough-in2/25/20022/26/20022/26/2002 12:00:00 AMAPASS
kitchen sink drain in the basement\\###-#### no one lives there, go in back door down to basement thi s a final also just replumbed the kitchen sink after they replaced the sewer. 2/26/2002 10:58:31 AM
PLM02-00049 Final2/25/20022/26/20022/26/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/25/2002 at 15:33:34. Contact: ###-####.
PLM02-00007 Plumbing Rough-in2/25/20022/26/20022/26/2002 12:00:00 AMANR
LEE ###-####
PLM01-03729 Water and/or Sewer2/26/20022/26/20022/26/2002 12:00:00 AMAPART
Added by Inspector: 330 On 2/26/2002 9:36:45 AM storm drainage from building thru transformer pad, 60' from d.i. piping ok test this pm
PLM01-03729 Storm Drains2/26/20022/26/20022/26/2002 12:00:00 AMPPART
Scheduled by Inspector: 330 On 2/26/2002 9:37:10 AM test on partial storm drain from bldg to apx. 30' from d.i. south side upper level. 2/26/2002 5:01:13 PM
PLM02-00343 Groundwork2/26/20022/26/20022/26/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 02/26/2002 at 09:46:11. Contact: ###-####. test on 4" contained from basement to f.s. on ground floor north side 2/26/2002 5:02:44 PM
PLM02-00454 Water and/or Sewer2/26/20022/26/20022/26/2002 12:00:00 AMPPASS
###-#### PATTY
PLM02-00230 Groundwork2/26/20022/26/20022/26/2002 12:00:00 AMPPASS
###-####\\not part of the mod.
PLM01-03907 Final2/26/20022/26/20022/26/2002 12:00:00 AMPPASS
###-####