PLM02-00449
| Sprinkler (Final) | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 14:38:42. Contact: ###-####.
|
PLM01-02356
| Other | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 15:33:08. Contact: ###-####.
|
MIS02-00033
| PLM-Conference | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 334 On 2/25/2002 3:43:41 PM met with bill thompson united water at job,gave correction notice and pics to bill,for possible termination, he checked his meter box, and found that someone installed lockes on watermeter,creating anotherdanger that water could not be turned of in an emergecy, locks removed by uw and meter was removed by bill t. 2/27/2002 6:52:04 AM
|
PLM02-00447
| Plumbing Rough-in | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | A | FAIL |
|
|
###-#### issued stop wrk notice,building accessorydweling without permit 2/27/2002 6:42:47 AM
|
PLM02-00448
| Sprinkler (Final) | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | PART |
|
|
###-#### KERRI
|
PLM00-02022
| Final | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-04183
| Final | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 08:08:37. Contact: ###-####.
|
PLM01-03879
| Final | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | PASS |
|
|
HAROLD- ###-#### IF LOCKED UP ... KEY CODE # 4006
|
PLM01-03965
| Final | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | PASS |
|
|
###-#### ROB
|