Inspections for the day of: Tuesday, February 26, 2002.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-00481 Rough-in2/25/20022/26/20022/26/2002 12:00:00 AMAPASS
###-####
MEC02-00481 Pressure Test2/25/20022/26/20022/26/2002 12:00:00 AMAPART
BLD02-00105 BLD-Energy code compliance2/25/20022/26/20022/26/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 02/25/2002 at 14:07:58. Contact: ###-####.need mec-chek, chk. floor& unfin. bonus rm at next insp, walls noted at r13. ok to rock walls 2/26/2002 11:30:27 AM
BLD01-03277 BLD-Framing/Rough-in2/25/20022/26/20022/26/2002 12:00:00 AMAPART
SCOTT ###-#### shaft & chase ok; keep 1" at b vent at bsmt. 2/26/2002 10:08:09 AM
MEC02-00553 Final2/26/20022/26/20022/26/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 02/26/2002 at 06:43:05. Contact: ###-####.
MEC02-00542 Final2/26/20022/26/20022/26/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 02/26/2002 at 06:52:07. Contact: ###-####....no emer gas valve, r/i ok 2/26/2002 10:46:05 AM
MEC02-00332 Final2/26/20022/26/20022/26/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 02/26/2002 at 06:52:34. Contact: ###-####.
BLD00-03538 BLD-Conference2/26/20022/26/20022/26/2002 12:00:00 AMAPASS
Added by Inspector: 340 On 2/26/2002 9:35:44 AM w/ Tom Basel, Comm'l Glass...still need listing for firestop annular space at fire windows
BLD00-01649 BLD-Conference2/26/20022/26/20022/26/2002 12:00:00 AMAPASS
Added by Inspector: 340 On 2/26/2002 9:37:37 AM w/ GS & Mel Perez...need adjust doors to ADA "push" req's; install gyp at retail area common wall to courtyard area per GS
BLD02-00114 BLD-Wall cover2/26/20022/26/20022/26/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/26/2002 at 09:34:24. Contact: ###-####. shear panels ok to cover, exc int gyp. 2/26/2002 1:33:25 PM
BLD02-00045 BLD-Framing/Rough-in2/26/20022/26/20022/26/2002 12:00:00 AMPPART
shear ###-#### Troy, ext nailing ok, add int sheathing at " condition 2..." panels, or eng'r as built ; ok to side.2/26/2002 4:05:25 PM 2/26/2002 4:05:45 PM
BLD02-00005 BLD-Final2/26/20022/26/20022/26/2002 12:00:00 AMPNR
###-#### ED ext. landings not complete 2/26/2002 4:14:29 PM
MEC01-03761 Final2/26/20022/26/20022/26/2002 12:00:00 AMPPASS
Added by Inspector: 340 On 2/26/2002 12:59:25 PM
MEC02-00553 Rough-in2/26/20022/26/20022/26/2002 12:00:00 AMPPASS
Added by Inspector: 340 On 2/26/2002 1:42:24 PM need emer. gas valve, r/i ok.
BLD02-00115 BLD-Conference2/26/20022/26/20022/26/2002 12:00:00 AMPPASS
Added by Inspector: 340 On 2/26/2002 3:22:47 PM ok to delete 4x4's at bay corners; int hd's ok to set above sill plate per Simpson.
BLD02-00310 BLD-Framing/Rough-in2/26/20022/26/20022/26/2002 12:00:00 AMPFAIL
mark ###-####; complete fireblocks at ceiling lines 2/26/2002 12:14:13 PM
BLD01-02389 BLD-Framing/Rough-in2/26/20022/26/20022/26/2002 12:00:00 AMPPART
###-#### shear nailing...ext nailing ok 2/26/2002 5:43:17 PM
MEC02-00563 Rough-in2/26/20022/26/20022/26/2002 12:00:00 AMPPASS
kim ###-####
BLD02-00284 BLD-Footing2/26/20022/26/20022/26/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 02/26/2002 at 08:41:32. Contact: ###-####.. 2/26/2002 1:46:46 PM
BLD01-03280 BLD-Framing/Rough-in2/25/20022/26/20022/26/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 02/25/2002 at 15:35:38. Contact: ###-####. shear panels, recall when right. 2/26/2002 4:31:18 PM
BLD01-02795 BLD-Final2/26/20022/26/20022/26/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/26/2002 at 06:11:22. Contact: ###-####.
BLD01-03188 BLD-Other2/25/20022/26/20022/26/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/25/2002 at 11:25:59. Contact: ###-####...shear panels ok 2/26/2002 2:03:42 PM