PLM02-00191
| Final | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-00453
| Plumbing Rough-in | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-00429
| Groundwork | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 09:25:59. Contact: ###-####. water test failed on DWV 2/27/2002 9:44:36 AM
|
PLM01-04188
| Final | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | FAIL |
|
|
water line\\###-#### need to use a approved method for testing of water line ( note water line full of water from unkown source will need to disinfect potable water system as per U.P.C. 609.9 and provide test result,s for us and united water ) 2/27/2002 10:56:13 AM
|