MEC02-00555
| Pressure Test | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | A | CANC |
|
|
###-#### WADE Disp set to [CANC] by a contractor via Hello! on 02/26/2002 at 07:09:24.
|
MEC02-00555
| Rough-in | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | A | CANC |
|
|
###-#### Wade Disp set to [CANC] by a contractor via Hello! on 02/26/2002 at 07:10:14.
|
MEC01-03889
| Final | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 11:41:56. Contact: ###-####. posted corrections 2/26/2002 12:48:12 PM
|
MEC01-02624
| Pressure Test | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | A | PART |
|
|
brian ###-#### low pressure to 3rd floor..section c..east end ok 2/26/2002 10:45:33 AM
|
MEC02-00413
| Rough-in | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 13:36:55. Contact: ###-####.
|
MEC02-00165
| Rough-in | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 14:51:21. Contact: ###-####. ok to cover ceilings in patient room..checked s/f dampers in kitchen 2/26/2002 9:34:20 AM
|
MEC02-00505
| Rough-in | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 17:32:12. Contact: ###-####. posted corrections 2/26/2002 10:14:50 AM
|
MEC02-00505
| Pressure Test | 2/25/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 17:32:33. Contact: ###-####.
|
MEC02-00555
| Rough-in | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | FAIL |
|
|
###-#### ###-####..between orchard and curtis 2/26/2002 12:43:48 PM
|
MEC02-00555
| Pressure Test | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | FAIL |
|
|
undersized 2/26/2002 3:53:27 PM
|
MEC02-00562
| Final | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 08:42:04. Contact: ###-####. tagged by another inspector 2/26/2002 1:22:15 PM
|
MEC02-00562
| Final | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 08:42:04. Contact: ###-####. tagged by another inspector 2/26/2002 1:22:15 PM
|
MEC02-00498
| Final | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | NH |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 08:42:56. Contact: ###-####...boise ave to parkriver 2/26/2002 12:45:05 PM
|
MEC02-00427
| Final | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 08:45:45. Contact: ###-####.
|
MEC02-00537
| Final | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 08:50:39. Contact: ###-####.
|
MEC02-00371
| Rough-in | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 09:19:30. Contact: ###-####. need comb air to equipment 2/26/2002 4:29:47 PM
|
MEC02-00371
| Pressure Test | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 09:19:46. Contact: ###-####. leak 2/26/2002 4:29:52 PM
|
MEC02-00185
| Final | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 09:20:44. Contact: ###-####...parkcenter..left on gossamer 2/26/2002 12:46:21 PM
|
MEC02-00564
| Rough-in | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 02/26/2002 at 09:39:33. Contact: ###-####...apple to wright 2/26/2002 12:41:33 PM
|
MEC02-00570
| Pressure Test | 2/26/2002 | 2/26/2002 | 2/26/2002 12:00:00 AM | P | FAIL |
|
|
gas pipe undersized 2/26/2002 4:17:12 PM
|