FIR03-00723
| INSP-Sprinkler Rough-in/Hydro | 2/25/2004 | 2/26/2004 | 2/26/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 2/25/2004 at 4:21:14 PM. Contact: ###-####. sprinkler not at final location but do provide coverage during remodel 2/26/2004 11:30:44 AM
|
FIR03-00725
| INSP-Sprinkler Rough-in | 2/26/2004 | 2/26/2004 | 2/26/2004 12:00:00 AM | P | PART |
|
|
Sprinklers not in final location but do provide coverage during remodel 2/26/2004 11:31:18 AM
|