FIR07-00402
| FIR-Aging Inspection | 2/26/2008 | 2/26/2008 | 2/26/2008 4:47:31 PM | | DEFR |
|
|
Not yet completed for inspection, work in progress.
|
BLD04-03036
| FIRE-Final Inspection | 2/25/2008 | 2/26/2008 | 2/26/2008 4:43:15 PM | A | PASS |
|
|
Corrections are complete, life safety inspection passed. Noted the elevator fire door needs adjusted for complete closure-to be repaired prior to structural final as discussed.
|
BLD07-01654
| FIRE-Conference | 2/26/2008 | 2/26/2008 | 2/26/2008 4:40:16 PM | P | DONE |
|
|
On site conference to discuss project phasing affecting fire alarm permit work.
|
BLD06-00755
| FIRE-Final Inspection | 2/26/2008 | 2/26/2008 | 2/26/2008 4:37:21 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR06-00326
| INSP-Final Inspection | 2/26/2008 | 2/26/2008 | 2/26/2008 3:35:56 PM | P | PASS |
|
|
Fire sprinkler permit work finaled.
|
FIR08-00105
| INSP-Final Inspection | 2/25/2008 | 2/26/2008 | 2/26/2008 3:35:13 PM | A | PASS |
|
|
Corrections are complete, final alarm testing passed per KR site visit, permit finaled.
|
FIR08-00113
| INSP-Sprinkler Rough-in | 2/25/2008 | 2/26/2008 | 2/26/2008 3:34:10 PM | A | PART |
|
|
Fire sprinkler rough-in is good for cover at the hard lid ceiling areas as red lined on approved plan set.
|
FIR08-00100
| INSP-Final Inspection | 2/25/2008 | 2/26/2008 | 2/26/2008 3:32:42 PM | A | PASS |
|
|
Fire alarm work passed field inspection per KR, permit finaled.
|
FIR08-00144
| INSP-Sprinkler Rough-in | 2/25/2008 | 2/26/2008 | 2/26/2008 3:31:18 PM | A | PART |
|
|
Overhead system modifications are approved for cover at the drop ceilings.
|