Inspections for the day of: Tuesday, February 26, 2008.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-00003 Tracking Control2/26/20082/26/20082/26/2008 3:46:50 PMPPASS
They have brought in new washed rock to do a topping on the construction entrance. Plus crew is cleaning up any tracking.
CAS#460
###-####
ESC07-01462 Random Inspection2/26/20082/26/20082/26/2008 2:25:52 PMPPART
Discussed with Lawrence over extending the wattle along the side of the lot for further sediment protection. Also to throw some gravel into the run off channel to slow the velocity of water flow. Will re-inspect on on Friday the 29th of Feb.
CAS#460
###-####
ESC04-00022 Site Final2/26/20082/26/20082/26/2008 10:22:13 AMPFAIL
Not ready, site not stabilzed nor bmps removed.
ESC06-01140 Site Final2/26/20082/26/20082/26/2008 10:21:38 AMAPASS
Stabilized PASS
CAS#460
###-####
ESC06-01139 Site Final2/26/20082/26/20082/26/2008 10:20:55 AMACANC
Stabilized PASS
CAS#460
###-####
ESC04-00022 Site Final2/26/20082/26/20082/26/2008 10:20:18 AMPCANC
ESC07-01418 Random Inspection2/26/20082/26/20082/26/2008 8:32:12 AMAPART
Site looks good. But all silt fence has not beem installed correctly. Needs to be installed by manufactures specs. Gave him a verbal Correction Notice. Will re-inspect on Friday 2/29/08
CAS #460
###-####
ESC07-01512 BMP Violation2/21/20082/26/20082/22/2008 12:56:06 PMAPASS
Sign has been posted with all correct information. Posted at front of building.

CAS
#460
###-####