ESC08-00871
| BMP Violation | 2/26/2009 | 2/26/2009 | 2/26/2009 4:35:11 PM | P | PART |
|
|
eeds to pick up wood const. debres and haul off or put in approved containers. Verbal c/n given to RP
|
BLD08-02182
| BLD-Framing/Rough-in | 2/26/2009 | 2/26/2009 | 2/26/2009 4:34:13 PM | P | PART |
|
|
Jim Phone #: ###-####. 1st. floor, 1st. layer of 5/8 type x rock, one side for 2hr. fire wall.
|
ESC08-00872
| BMP Violation | 2/26/2009 | 2/26/2009 | 2/26/2009 3:31:31 PM | P | PART |
|
|
Needs to clean up all wood const. debries and haul off or put in approved containers. Verbal c/n given to RP.
|
BLD08-02183
| BLD-Framing/Rough-in | 2/26/2009 | 2/26/2009 | 2/26/2009 3:30:44 PM | P | PART |
|
|
Jim Phone #: ###-####. 1st. flor, 1st. layer of 5/8 type x rock, one side for 2hr. fire wall.
|
ESC08-00873
| BMP Violation | 2/26/2009 | 2/26/2009 | 2/26/2009 3:30:05 PM | P | PART |
|
|
Needs to clean up all wood const. debries and haul off or put in approved containers. Verbal c/n given to RP.
|
BLD08-02184
| BLD-Framing/Rough-in | 2/26/2009 | 2/26/2009 | 2/26/2009 3:29:12 PM | P | PART |
|
|
Jim Phone #: ###-####. 1st. floor, 1st. layer of 5/8 type x rock, one side only for 2hr. fire wall.
|
ESC08-00874
| BMP Violation | 2/26/2009 | 2/26/2009 | 2/26/2009 3:28:25 PM | P | PART |
|
|
Needs to pick up all wood const. debries and haul off or put in approved containers. Verbal c/n given to RP.
|
BLD08-02185
| BLD-Framing/Rough-in | 2/26/2009 | 2/26/2009 | 2/26/2009 3:27:26 PM | P | PART |
|
|
Jim Phone #: ###-####. 1st. floor, 1st. layer of 5/8 type x rock, one side only for 2hr. fire barrier wall.
|
ESC08-00888
| General Inspection | 2/26/2009 | 2/26/2009 | 2/26/2009 3:24:02 PM | P | PASS |
|
|
ESC permit sign posted, all BMP's in place. General site conditions were good.
|
BLD08-02196
| BLD-Framing/Rough-in | 2/26/2009 | 2/26/2009 | 2/26/2009 3:23:21 PM | P | NR |
|
|
Jim Phone #: ###-####
|
ESC08-00886
| General Inspection | 2/26/2009 | 2/26/2009 | 2/26/2009 3:23:02 PM | P | PASS |
|
|
ESC permit sign posted, all BMP's in place. General site conditions were clean.
|
BLD08-02195
| BLD-Framing/Rough-in | 2/26/2009 | 2/26/2009 | 2/26/2009 3:22:15 PM | P | PASS |
|
|
Jim Phone #: ###-####. 2nd. floor, 1st. layer of 5/8 type x rock, one side only for 2hr. fire wall.
|
ESC08-00885
| General Inspection | 2/26/2009 | 2/26/2009 | 2/26/2009 3:21:11 PM | P | PASS |
|
|
ESC permit sign posted, BMP's in lace. General site conditions were clean.
|
BLD08-02194
| BLD-Framing/Rough-in | 2/26/2009 | 2/26/2009 | 2/26/2009 3:20:21 PM | P | PART |
|
|
Jim Phone #: ###-####. 2nd. floor, 1st. layer of 5/8 type x rock , one side only, for 2hr. fire wall.
|
ESC08-00981
| Site Preparation | 2/26/2009 | 2/26/2009 | 2/26/2009 2:12:22 PM | P | PART |
|
|
Const. enterance has been installed, conc washout has been provided, lots have been delinated. Needs to post ESC permit signs at controlled enterance. Verbal c/n was given to RP.
|
ESC08-00981
| Site Preparation | 2/26/2009 | 2/26/2009 | 2/26/2009 2:06:21 PM | P | CANC |
|
|
|
ESC08-00979
| Site Preparation | 2/26/2009 | 2/26/2009 | 2/26/2009 2:02:53 PM | P | CANC |
|
|
|
BLD08-02393
| BLD-Footing | 2/25/2009 | 2/26/2009 | 2/26/2009 2:02:06 PM | P | NR |
|
|
ian Phone #: ###-####. Contractor will reschedule insp.
|
ESC08-00979
| Site Preparation | 2/26/2009 | 2/26/2009 | 2/26/2009 2:00:33 PM | P | PART |
|
|
Controlled const. enterance wit filter fabric and top dressing is installed. Conc. washout area has been provided. Lot lines have been provided. Needs to put ESC signs at controlled enterance. Verbal c/n given to RP.
|
BLD08-02395
| BLD-Footing | 2/25/2009 | 2/26/2009 | 2/26/2009 1:57:52 PM | P | PASS |
|
|
ian Phone #: ###-####. Perimeter footings ok.
|
ESC08-00933
| Tracking Control | 2/24/2009 | 2/26/2009 | 2/26/2009 1:56:08 PM | P | PART |
|
|
New top dressing at controlled enetrance has been installed. Still needs to post ESC signs at controlled enterance. A verbal c/n was given to the RP.
|
ESC08-00878
| Random Inspection | 2/26/2009 | 2/26/2009 | 2/26/2009 9:52:53 AM | A | PASS |
|
|
|
ESC08-00879
| Random Inspection | 2/26/2009 | 2/26/2009 | 2/26/2009 9:52:35 AM | A | PASS |
|
|
|
ESC08-00871
| Random Inspection | 2/26/2009 | 2/26/2009 | 2/26/2009 9:52:21 AM | A | PASS |
|
|
|
ESC08-00872
| Random Inspection | 2/26/2009 | 2/26/2009 | 2/26/2009 9:52:10 AM | A | PASS |
|
|
|
ESC08-00873
| Random Inspection | 2/26/2009 | 2/26/2009 | 2/26/2009 9:51:59 AM | A | PASS |
|
|
|
ESC08-00874
| Random Inspection | 2/26/2009 | 2/26/2009 | 2/26/2009 9:51:46 AM | A | PASS |
|
|
|
ESC08-00942
| Random Inspection | 2/26/2009 | 2/26/2009 | 2/26/2009 9:03:08 AM | A | PASS |
|
|
|
ESC08-00942
| Site Preparation | 2/26/2009 | 2/26/2009 | 2/26/2009 9:03:01 AM | A | PASS |
|
|
|
BLD08-02311
| BLD-Foundation | 2/26/2009 | 2/26/2009 | 2/26/2009 9:02:23 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 2/26/2009 at 6:58:36 AM. Contact: ###-####.
|