Inspections for the day of: Friday, February 26, 2010.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00709 INSP-Conference2/25/20102/26/20102/26/2010 6:20:14 PMADONE
On site visit with responding fire department station 12 crew and Captain Bill Ream regarding insufficient access to the existing FDC due to adjacent building service equipment and surrounding fenced enclosure. Fire department connections must be in compliance with IFC 2006 sec. 912.1, 912.2, 912.3 for installation, location and access. Contractor to provide plan modification documents indicating proposed new FDC location in accordance with the applicable standards prior to site inspection for approval. Power Bar representatives Michael Fanelle and Michelle McMullen included in the discussion on premise. Permit finals pending.
FIR09-00642 INSP-Sprinkler Rough-in/Hydro2/26/20102/26/20102/26/2010 5:46:37 PMPPART
Concluded satisfactory 24 hr. air test @ 2:00PM 2/26 for overhead dry system install. Also okayed ceiling cover at the mens and womens restrooms and two new offices, new RR vestibules are not approved for cover due to pending fire resistive coatings at exposed wood.
BLD10-00305 FIRE-Conference2/25/20102/26/20102/26/2010 5:39:42 PMADONE
Regarding project completion schedule for issued permits and necessary upgrade to provide a building fire alarm system for sprinkler and hood suppression system monitoring.
FIR10-00080 INSP-Sprinkler Rough-in2/25/20102/26/20102/26/2010 5:36:00 PMAPART
Duplicate inspection request. Note: original fire protection plans indicate a fire sprinkler head count of 131.
FIR09-00536 INSP-Sprinkler Rough-in/Hydro2/25/20102/26/20102/26/2010 5:34:02 PMAPART
Concluded satisfactory 24 hr. air testing of the new dry system.
FIR09-00310 INSP-Final Inspection2/19/20102/26/20102/26/2010 5:32:19 PMAPASS
Scope of fire alarm work passed site testing, contractor to post an updated building map including changes at the panel as discussed, also need to amend account address "802 W Bannock St." only.