ESC13-00122
| General Inspection | 2/26/2013 | 2/26/2013 | 2/26/2013 12:00:00 AM | | PASS |
|
|
|
ESC13-00011
| Site Preparation | 2/26/2013 | 2/26/2013 | 2/26/2013 12:00:00 AM | P | FAIL |
|
|
Met onsite with Mike Strasser (Boise PW), Keith (Knife River) and Clint Smith (Boise PDS). The anticipated pumping capacity exceeds the amount calculated for in the dewatering plan. This site is not approved to dewater to the neighboring surface water (un-named pond). Please submit a revised plan prior to discharging. Followed up with Mike Cole (Knife River) via telephone.
|