BLD14-03284
| BLD-Conference | 2/26/2015 | 2/26/2015 | 3/2/2015 9:50:25 AM | P | PASS |
|
|
Nate Phone #: ###-####
|
BLD14-03559
| BLD-Conference | 2/25/2015 | 2/26/2015 | 2/26/2015 4:21:21 PM | P | CANC |
|
|
Job site walk Phone #: ###-#### Inspection requested via web by Trent Green
|
BLD14-03407
| BLD-Framing/Rough-in | 2/26/2015 | 2/26/2015 | 2/26/2015 3:57:08 PM | P | NR |
|
|
Cameron Phone #: ###-#### need mech
|
BLD14-01997
| BLD-Final | 2/25/2015 | 2/26/2015 | 2/26/2015 3:53:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by mark neice
|
BLD13-03170
| BLD-Final | 2/26/2015 | 2/26/2015 | 2/26/2015 3:52:43 PM | P | PASS |
|
|
occ ok
|
BLD12-03284
| BLD-Final | 2/25/2015 | 2/26/2015 | 2/26/2015 3:34:57 PM | P | NR |
|
|
Please call Burk @ ###-#### for time.
|
BLD14-03486
| BLD-Framing/Rough-in | 2/25/2015 | 2/26/2015 | 2/26/2015 2:41:16 PM | A | PART |
|
|
Brian Phone #: ###-#### review top of wall detail/ rfi to arch for wide flange perpendiclur penatratio. menbrane.
|
BLD14-03564
| BLD-Framing/Rough-in | 2/26/2015 | 2/26/2015 | 2/26/2015 1:23:56 PM | P | PASS |
|
|
Bob-fire rated soffits Phone #: ###-####
|
BLD14-03564
| BLD-Framing/Rough-in | 2/25/2015 | 2/26/2015 | 2/26/2015 12:02:43 PM | A | PASS |
|
|
bobby Phone #: ###-####
|
BLD15-00299
| BLD-Final | 2/25/2015 | 2/26/2015 | 2/26/2015 11:15:08 AM | A | PASS |
|
|
Joe Phone #: ###-####
|
MIS14-00190
| MIS-Aging Inspection | 2/26/2015 | 2/26/2015 | 2/26/2015 11:14:54 AM | | NR |
|
|
|
BLD13-02425
| BLD-Wall cover | 2/25/2015 | 2/26/2015 | 2/26/2015 10:58:52 AM | A | PASS |
|
|
Level 2 east hallway wall inspection and Exterior sheathing nailing inspection at the CMU wall only Phone #: ###-#### Inspection requested via web by Mike Wilson ok to pre rock corridor at ceilling and 24 inches down walls
|