ESC15-00606
| General Inspection | 2/19/2016 | 2/19/2016 | | | |
|
|
|
MIS16-00046
| BLD-Conference | 2/19/2016 | 2/19/2016 | | P | |
|
|
|
BLD12-03170
| BLD-Conference | 2/24/2016 | 2/26/2016 | 2/26/2016 4:01:43 PM | P | FAIL |
|
|
as per Jonathan, a life safety inspection was to be scheduled for today. The inspection was not scheduled. Will check back in 5 days.
|
BLD15-04260
| BLD-Final | 2/26/2016 | 2/26/2016 | 2/26/2016 3:51:29 PM | P | FAIL |
|
|
Plumbing to be done pm today as well-Improvements complete. Requesting final inspections as deemed necessary by the City of Boise. Phone #: ###-#### Inspection requested via web by Ted Owens. Provide a means to open the security grill from the inside with out the use of key or special knowledge. Plumbing final has also failed.
|
BLD15-04260
| BLD-Ceiling Grid Inspection | 2/26/2016 | 2/26/2016 | 2/26/2016 3:50:15 PM | P | DONE |
|
|
Plumbing to be done pm today as well-Improvements complete. Requesting final inspections as deemed necessary by the City of Boise for the Certificate of Occupancy. The ceiling tiles were replaced with new ceiling tile and only minor corrections were necessary to replace existing bent or stained T-bars. Phone #: ###-#### Inspection requested via web by Ted Owens. grid is existing.
|
BLD15-00244
| BLD-Final | 2/26/2016 | 2/26/2016 | 2/26/2016 2:55:18 PM | P | PART |
|
|
OK for temp occ. Will be ok for perm occ once zoning signs perm.
|
BLD15-00242
| BLD-Final | 2/26/2016 | 2/26/2016 | 2/26/2016 2:33:53 PM | P | CANC |
|
|
Cody Phone #: ###-####. wrong permit scheduled.
|
BLD15-04490
| BLD-Footing | 2/26/2016 | 2/26/2016 | 2/26/2016 2:21:45 PM | P | PASS |
|
|
Footing rebar inspection, ready at 2PM Phone #: ###-#### Inspection requested via web by Mike McHargue. Permiter footings ok.
|
BLD15-04351
| BLD-Framing/Rough-in | 2/26/2016 | 2/26/2016 | 2/26/2016 1:54:33 PM | P | FAIL |
|
|
Tom Phone #: ###-####. Provide additional straps to all beam to column connections (both sides) Strap double top plate at drryer duct. Complete fireblocking behind shower upstairs. No acces to approvrd plans. Columns for patio cover in rear?
|
BLD16-00378
| BLD-Footing | 2/26/2016 | 2/26/2016 | 2/26/2016 1:27:28 PM | P | PART |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. Work in progress. instyaliing rebar and needs to adjust column pad at southwest corner of house, not correct size.
|
BLD15-01754
| BLD-Footing | 2/26/2016 | 2/26/2016 | 2/26/2016 1:25:38 PM | P | PASS |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD16-00317
| BLD-Final | 2/24/2016 | 2/26/2016 | 2/26/2016 11:49:29 AM | A | NR |
|
|
Rip-please call to meet Phone #: ###-####. Fire/life/safety final inspection has failed.
|
GCB15-00102
| GCB-Final | 2/25/2016 | 2/26/2016 | 2/26/2016 9:45:27 AM | A | FAIL |
|
|
Joe ###-####. North doors require a landings. Stairway to storage above is non compliant. Needs to met IBC 7 inch max rise. 11 inch max run.
|
BLD15-04490
| BLD-Conference | 2/25/2016 | 2/26/2016 | 2/26/2016 9:01:24 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Mike McHargue
|