ELE19-00343
| Final | 2/25/2019 | 2/26/2019 | 2/26/2019 3:13:18 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Nelson...ok to final
|
ELE16-00047
| Final | 2/25/2019 | 2/26/2019 | 2/26/2019 3:05:59 PM | P | PASS |
|
|
Michael-is not able to be home before 2:30 Phone #: ###-####...ok to final
|
ELE19-00689
| Conference | 2/25/2019 | 2/26/2019 | 2/26/2019 2:43:31 PM | P | PASS |
|
|
Assuming I need to meet at the residence? Phone #: ###-#### Inspection requested via web by Tim Peppersack... discussed wiring of new bath and bedroom extension...ARC fault protection, bathroom circuit-what can be on it, back outlets and exterior light circuit...homeowner competent in work
|
ELE19-00668
| Final | 2/25/2019 | 2/26/2019 | 2/26/2019 1:10:00 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kyle Dillon...ok to final
|
ELE19-00678
| Conference | 2/26/2019 | 2/26/2019 | 2/26/2019 11:37:01 AM | A | PASS |
|
|
scope and requirements of work to be done... discussed contractor informed
|
ELE19-00678
| Electrical Rough-In | 2/25/2019 | 2/26/2019 | 2/26/2019 10:37:15 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by shane miller...
required building permit needs issued before electrical inspection can be done...called contractor and left message...no response or returned call
|
ELE18-03376
| Final | 2/25/2019 | 2/26/2019 | 2/26/2019 10:09:55 AM | P | PASS |
|
|
we went back and stickered fixtures for LED tubes. You can go any time after 10am. Phone #: ###-#### Inspection requested via web by Tim Dunlop... labelling verified...ok to final
|
ELE18-03724
| Final | 2/25/2019 | 2/26/2019 | 2/26/2019 9:38:15 AM | A | PASS |
|
|
This permit was to be finaled at the same time that AltEnergy Finaled their solar install - (already finaled) - we only hooked up the power to the solar Phone #: ###-#### Inspection requested via web by JENNY EMEL... labelling, disconnect, and OCPD ok approved 10/02/18 as per PV final permit # ELE18-03704
|
ELE16-00483
| ELE-Aging Inspection | 2/26/2019 | 2/26/2019 | 2/26/2019 9:21:33 AM | | FAIL |
|
|
contractor needs to schedule final and get access for inspection
|
ELE18-03723
| Final | 2/25/2019 | 2/26/2019 | 2/26/2019 8:42:11 AM | A | PASS |
|
|
This permit was to be finaled at the same time that AltEnergy Finaled their solar install permit (already finaled) - we only hooked up power for solar Phone #: ###-#### Inspection requested via web by JENNY EMEL... labelling, disconnect, and OCPD ok approved at time of final for PV install see notes ELE18-03667
|
ELE19-00399
| Final | 2/21/2019 | 2/26/2019 | 2/22/2019 1:07:11 PM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Brecklee Brown Inspection cancelled from web by: Brecklee Brown
|
ELE19-00399
| Electrical Rough-In | 2/21/2019 | 2/26/2019 | 2/22/2019 1:07:08 PM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Brecklee Brown Inspection cancelled from web by: Brecklee Brown
|