Inspections for the day of: Tuesday, February 26, 2019.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-00343 Final2/25/20192/26/20192/26/2019 3:13:18 PMAPASS
Phone #: ###-#### Inspection requested via web by David Nelson...ok to final
ELE16-00047 Final2/25/20192/26/20192/26/2019 3:05:59 PMPPASS
Michael-is not able to be home before 2:30 Phone #: ###-####...ok to final
ELE19-00689 Conference2/25/20192/26/20192/26/2019 2:43:31 PMPPASS
Assuming I need to meet at the residence? Phone #: ###-#### Inspection requested via web by Tim Peppersack...
discussed wiring of new bath and bedroom extension...ARC fault protection, bathroom circuit-what can be on it, back outlets and exterior light circuit...homeowner competent in work
ELE19-00668 Final2/25/20192/26/20192/26/2019 1:10:00 PMPPASS
Phone #: ###-#### Inspection requested via web by Kyle Dillon...ok to final
ELE19-00678 Conference2/26/20192/26/20192/26/2019 11:37:01 AMAPASS
scope and requirements of work to be done...
discussed contractor informed
ELE19-00678 Electrical Rough-In2/25/20192/26/20192/26/2019 10:37:15 AMACANC
Phone #: ###-#### Inspection requested via web by shane miller...

required building permit needs issued before electrical inspection can be done...called contractor and left message...no response or returned call
ELE18-03376 Final2/25/20192/26/20192/26/2019 10:09:55 AMPPASS
we went back and stickered fixtures for LED tubes. You can go any time after 10am. Phone #: ###-#### Inspection requested via web by Tim Dunlop...
labelling verified...ok to final
ELE18-03724 Final2/25/20192/26/20192/26/2019 9:38:15 AMAPASS
This permit was to be finaled at the same time that AltEnergy Finaled their solar install - (already finaled) - we only hooked up the power to the solar Phone #: ###-#### Inspection requested via web by JENNY EMEL...
labelling, disconnect, and OCPD ok
approved 10/02/18 as per PV final
permit # ELE18-03704
ELE16-00483 ELE-Aging Inspection2/26/20192/26/20192/26/2019 9:21:33 AM FAIL
contractor needs to schedule final and get access for inspection
ELE18-03723 Final2/25/20192/26/20192/26/2019 8:42:11 AMAPASS
This permit was to be finaled at the same time that AltEnergy Finaled their solar install permit (already finaled) - we only hooked up power for solar Phone #: ###-#### Inspection requested via web by JENNY EMEL...
labelling, disconnect, and OCPD ok
approved at time of final for PV install
see notes ELE18-03667
ELE19-00399 Final2/21/20192/26/20192/22/2019 1:07:11 PMPCANC
Phone #: ###-#### >> Inspection requested via web by Brecklee Brown Inspection cancelled from web by: Brecklee Brown
ELE19-00399 Electrical Rough-In2/21/20192/26/20192/22/2019 1:07:08 PMPCANC
Phone #: ###-#### >> Inspection requested via web by Brecklee Brown Inspection cancelled from web by: Brecklee Brown