Inspections for the day of: Wednesday, February 26, 2020.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00178 General Inspection2/26/20202/26/20202/28/2020 9:35:00 AM PASS
Site still needs to be landscaped, has revegetation bond.
ESC19-00270 Aging Inspection2/26/20202/26/20202/27/2020 1:46:48 PM PASS
Exterior of both home and ADU look completed. Lot is still bare. Mostly clean, one area of paint washout.
ESC19-00249 Aging Inspection2/26/20202/26/20202/27/2020 10:37:25 AM PASS
Entire site is gravel covered and clean. Exterior work nearly completed on all buildings. No loose trash, no issues.
ESC19-01734 Site Preparation2/26/20202/26/20202/26/2020 3:42:29 PMPPASS
Met with Robert Bruno on site. Has perimeter wattle along bottom, lined washout, and lined entrance. Storing backfill on neighboring parcel, is owner. ]
Crew setting forms.
ESC17-00018 General Inspection2/26/20202/26/20202/26/2020 3:20:10 PM PASS
All work east of Eckert completed.
1 home framed and under construction to west, 1 home just getting forms delivered to site.
Ecopans on site.
ESC19-00584 General Inspection2/26/20202/26/20202/26/2020 3:11:42 PMPPASS
Water being discharged is .84 NTU. Still only one well point ready, plans on getting second pumping tomorrow. Will pump into pond retention until clear and add to water leaving site. Some ponding along pipeline fromm leaking seals. Will get repaired, county is concerned about water backing up into storm drain along Warm Springs, will add berm around sewer cap.
Hauling material out of west pond to north side of road, has sweeper runnuing and makes sure everything clean end of day.
Keeping NTU log on site.