PLM96-00241
| INSP - Ground work | 2/26/1996 | 2/27/1996 | 2/29/1996 12:00:00 AM | A | CANC |
|
|
THIS SHOULD HAVE BEEN DONE 2-26-96PM. I PUT IT IN FOR STAN HE WAS NOT HERE. 14 FIXTURES CANCELLED GARY Z. DID THE INSPECTION.MPM
|
PLM96-00336
| INSP - Sewer line | 2/26/1996 | 2/27/1996 | 2/27/1996 12:00:00 AM | A | PASS |
|
|
replacement only o/k 347/jws
|
PLM96-00337
| INSP - Plumbing Rough-in | 2/27/1996 | 2/27/1996 | 2/27/1996 12:00:00 AM | P | CANC |
|
|
1 W/C 1 SHOWER 1 SINK 1 W/B 1 W/H 1 LAUNDRY TRAY CRAIG W/LACY CANCELLED NEEDS TO RESCHEDULE FOR AM 2/28/96-MPM
|
PLM96-00338
| INSP - Sewer and Water lines | 2/27/1996 | 2/27/1996 | 2/27/1996 12:00:00 AM | P | PASS |
|
|
S&W O/K 2/27/96 347/JWS
|
PLM96-00334
| INSP - Sewer and Water lines | 2/27/1996 | 2/27/1996 | 2/27/1996 12:00:00 AM | P | PASS |
|
|
correction made o/k 2/27/96 347/jws
|
PLM95-00052
| INSP - Final | 2/27/1996 | 2/27/1996 | 2/27/1996 12:00:00 AM | P | PASS |
|
|
FINAL O/K 2/27/96 347/JWS
|
PLM96-00051
| INSP - Plumbing Rough-in | 2/27/1996 | 2/27/1996 | 2/27/1996 12:00:00 AM | P | PASS |
|
|
13 FIXTURES W/C 3 BASIN 4 TUB 2 SHR 1 SINK 1 W/B 1 W/H 1 R/I O/K 2/27/96 347/JWS
|
PLM96-00077
| INSP - Plumbing Rough-in | 2/26/1996 | 2/27/1996 | 2/26/1996 12:00:00 AM | A | NR |
|
|
16 FIXTURES
|