ELE00-04069
| Rough-In Permanent Service | 2/26/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | A | PART |
|
|
###-#### jon looked at job and scheduled conf. 2/27/2001 9:51:14 AM
|
ELE01-00542
| Electrical Rough-In | 2/26/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | A | PART |
|
|
###-#### Looked at jab and scheduled conf. 2/27/2001 9:52:30 AM
|
ELE01-00540
| Electrical Rough-In | 2/26/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | A | PART |
|
|
###-#### lock box at the front door there are three inspections set up and the combo is193
Looked at job and scheduled conf. 2/27/2001 9:51:53 AM
|
ELE01-00596
| Rough-In Permanent Service | 2/26/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | A | PASS |
|
|
P/S U/G N Ok 2/27/2001 11:34:42 AM
|
ELE01-00602
| Permanent Service | 2/27/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | PART |
|
|
per ser ted-- ###-#### P/S O/H R Ok for power 2/27/2001 4:33:08 PM
|
ELE01-00540
| Electrical Rough-In | 2/27/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 336 On 2/27/2001 9:47:23 AM scuttles nail plates bends in smerf 2/27/2001 2:19:36 PM
|
ELE00-04069
| Rough-In Permanent Service | 2/27/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 336 On 2/27/2001 9:48:03 AM P/S U/G N Ok 2/27/2001 2:17:47 PM
|
ELE01-00542
| Electrical Rough-In | 2/27/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 336 On 2/27/2001 9:52:54 AM scuttles and nail plates bends in smerf 2/27/2001 2:18:47 PM
|
ELE97-03971
| Final | 2/27/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by Inspector: 336 On 2/27/2001 4:28:05 PM 3 rooms and space heaters not inspected 2/27/2001 4:59:49 PM
|
ELE00-03881
| Final | 2/26/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | FAIL |
|
|
###-#### open wires not grounded pole lights 2/27/2001 3:18:56 PM
|
ELE01-00034
| Final | 2/26/2001 | 2/27/2001 | 2/27/2001 12:00:00 AM | P | PASS |
|
|
|